Laserfiche WebLink
Attachment A <br /> CALA www.callanderassociates.com <br /> Recreate <br /> Educate <br /> Live+Work <br /> Connect <br /> Via Email Only Sustain <br /> Revised October 11, 2021 <br /> Meeting Summary <br /> Nevada Street Improvements CD's <br /> RE: Integration w/ CSG plans for intersection <br /> Date: October 6, 2021 <br /> Time: 1:00 pm to 2:00am <br /> Attendees: City of Pleasanton (City): <br /> Matthew Gruber (MG), City Landscape Architect <br /> Mike Tassano (MT), Deputy Director of Community Dev, Transportation <br /> Cedric Novenario (CN), Senior Traffic Engineer <br /> Adam Nelkie (AN), Acting Director of Engineering <br /> CSG: <br /> Lawrence Lau <br /> Stephen Tovmassian <br /> TJ KM: <br /> Erik Bjorklund <br /> BKF Engineers (BKF): <br /> Jason Mansfield (JM), Associate Engineer <br /> Callander Associates (CALA): <br /> Mark Slichter (MS), Principal <br /> Zachary Katz (ZK), Job Captain <br /> The following items were discussed and/or decided upon during the meeting. <br /> Item Action to take <br /> The purpose of the meeting was to determine how the <br /> Bernal intersection and Nevada St. improvements would tie- <br /> in. <br /> 1. Project limits to meet approximately a few feet west of <br /> the Zone 7 driveway. See Diagram A below. <br /> 2. City preferred lane widths including curb lane and <br /> gutter pan (from north side of street at Bernal to south <br /> side) are 6' (bike lane) 11 ', 11 ', 1 1 ', 11 '. <br /> BURLINGAME GOLD RIVER SAN JOSE <br /> 1633 Bayshore Highway,Suite 133 12150 Tributary Point Drive,Suite 140 2025 Gateway Place,Suite 285 <br /> Burlingame,CA 94010 Gold River,CA 95670 San Jose,CA 95110 <br /> 650.375.1313 916.985.4366 408.275.0565 <br />