Laserfiche WebLink
May 13, 2022 <br /> Existing StFeet monuments reqUiFeEl a control line that matEhed exactly, <br /> This took multiple iteFatiORS W FeEFeate, FatheF than being simply aR offset $600 <br /> Coordination with Bernal intersection, including site meeting with $2,000 <br /> consultants and City. <br /> Reselying existing Utility 'REE)nsisteRdes between Fnany di4eFent as built <br /> nl_a RS suFface featwFes USA FRaIckings, Rd a eRtly mAr-+-aIlo.d .-able I' + .$,4,000 <br /> shE)WR on as built dFaW*RgS-. <br /> TOTAL(Lump Sum) $2,000 <br /> 5.1.2.1.1. Future out of scope work, not yet performed: <br /> - Bernal asphalt grinding, including site visit and survey if required. $4,500 <br /> - Stormwater treatment alternative concept evaluation and exhibit(3/29/22), $1,500 <br /> as directed by the City, for inverts and drainage patterns at curb and <br /> treatment planter locations and sizes. Work included coordination calls <br /> with design team and City. <br /> - Evaluate relocation of cable line—relative to trees, storm drainage and $3,000 <br /> potential changes to conflicting elements. <br /> - Revised striping for taper near California Ave., including meetings and $1,500 <br /> documentation for standards. <br /> 100 <br /> C—A—Afirlm. ,4iE Rt r Rt E+'.. <br /> TOTAL(Hourly, not to exceed) $10,500 <br /> Thank you for the opportunity to present this proposal.We look forward to continue working with you in the <br /> development of this project. Please contact me at (650)482-6422 orjmansfield@bkf.com if you have any <br /> questions. <br /> Respectfully, <br /> BKF Engineers, a California corporation <br /> .�2 �/ <br /> :� <br /> Jaso ansfield, PE <br /> sociate <br /> License No. CA RCE 59567 <br /> PF <br /> Page 2 of 2 BKF ENGINEERS <br />