My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
071922
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2022 4:08:53 PM
Creation date
7/14/2022 12:39:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/19/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 13, 2022 ' <br /> BKF No 20210198-12 <br /> AAr <br /> Zach Katz, PLA <br /> Callander Associates <br /> 1633 Bayshore Highway, Suite 133 <br /> Burlingame, CA 94010 <br /> Transmitted Via Email <br /> Subject: Nevada Street Bicycle and Pedestrian Improvement Project <br /> Civil Engineering and Surveying Services <br /> Additional Services Proposal <br /> Dear Zach: <br /> BKF Engineers welcomes the opportunity to submit this proposal for additional civil engineering services on the <br /> Nevada Street project. <br /> The original scope of our contract was established in early 2021. Since then, further development of the project <br /> has revealed and resulted in additional scope and effort. This additional services proposal is intended to <br /> incorporate that scope and effort,with additional budget, into our contract. We hope this would cover the <br /> additional effort expended to-date and the effort anticipated to bring this project to completion. <br /> 5.1.1.D.1.Out of scope work already completed: <br /> - Geometry and striping were attempted to be set at the 12/22/21 35% <br /> submittal using exhibits distributed on:9/22/21, 9/29/21, 10/6/21, 10/12/21, <br /> and 11/9/21. <br /> Curb line was adjusted 2 times. Originally set based on City standard, after <br /> site meeting with traffic to identify non-standard parking tick dimensions, <br /> this dictated the length of parking lanes. <br /> The post 35%changes (revised for no tick marks and then revised again for <br /> smaller"plaza" area) required: <br /> o Revised Civil3D alignment <br /> o Revision to linework <br /> o Revised profile $6,500 <br /> - Added speed feedback signs. $1,000 <br /> $2,000 <br /> TOTAL(Lump Sum) $7,500 <br /> 5.1.1.D.2.Work that required additional effort already completed: <br /> Roadway geemetIFY Was FneFe complicated than expected with Fnu4�p� ?899 <br /> BKF ENGINEERS <br /> 255 Shoreline Drive,Suite 200,Redwood City,CA 94065 1 650.482.6300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.