Laserfiche WebLink
SECTION 2. GENERAL CONDITIONS <br /> 2.01 General <br /> The Contractor shall not be held responsible for plant losses due to maladies beyond the <br /> Contractor's control; this includes, but is not limited to, disease or insect attack for which <br /> there is no legal recommended control, acts of vandalism, earthquakes, fires, unusual <br /> storms, and related events. Report all such conditions to the City in writing and submit a <br /> proposal for the repair of the work. Obtain the City's approval prior to proceeding with <br /> the work affected. <br /> 2.02 Replacement of Plants <br /> The Contractor shall remove dead and irreparably damaged lawn, groundcover,trees, <br /> shrubs, or other plant material and replace it at his own expense when such death or <br /> damage is due to Contractor's failure to provide maintenance in accordance with the <br /> provisions herein. Contractor shall remove and replace such plant material within two <br /> weeks of notification by the City. Plants shall be replaced with material of equivalent <br /> size and variety to material being removed unless other material is approved by the City. <br /> All replacement material shall be approved by the City before installation by the <br /> Contractor. <br /> 2.03 Work Not Included <br /> A. Repairs or replacement of losses and damages not covered by the contract, <br /> except as noted. <br /> B. New planting and other special services, except with City's request or <br /> approval in writing and agreement to pay. <br /> C. Major vandalism or damage caused by natural disasters. <br /> Exhibit A-Scope of Work 2022 <br /> Rev.4/29/2022 Page 5 <br />