Laserfiche WebLink
5. Fertilize TY (Spring& Fall) <br /> 6. Pest/Disease Control As Needed <br /> 7. Pruning/Structural, < 15' height As Needed (No less than every 6 mos.) <br /> 8. Staking/Removal/Retracing As Needed <br /> 9. Replacement of Mulch EX <br /> D. NON-VEGETATED AREAS <br /> FREQUENCY <br /> 1. Leaf, Litter and Trash Removal W <br /> 2. Weed Control Q <br /> 3. Refurbishment of Bark EX <br /> 4. Graffiti Removal EX <br /> 5. Pre-emergent herbicide Y <br /> E. PAVED AREAS FREQUENCY <br /> 1. Leaf, Litter and Trash Removal W <br /> 2. Weed Control W <br /> 3. Graffiti Removal EX <br /> F. SITE CONSIDERATIONS FREQUENCY <br /> 1. Site Inspections Once per month <br /> 2. Fire Control Per City Requirements - WA <br /> 3. Clean V-Ditches, Drain Inlets and Once in February <br /> Drainage Swales Once between October 15 and <br /> October 30 <br /> Once between November 15 and <br /> November 30 <br /> Once between December 15 and <br /> December 31, and as needed, <br /> directed by Project Administrator <br /> Exhibit A-Scope of Work 2022 <br /> Rev.4/29/2022 Page 4 <br />