Laserfiche WebLink
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> rrm April 20, 2022 <br /> design Page 3 of 9 <br /> group <br /> RRM will submit a draft version of the drainage and stormwater control plan and the <br /> City of Pleasanton Stormwater Requirements Checklist with the 60% PS&E and the final <br /> version will be submitted with the 100% PS&E <br /> Pump Plan <br /> Due to the grades of the project site and proposed skate park, a pump is needed in the skate <br /> park area to pump stormwater to the drainage system and stormwater treatment measures. <br /> RRM will calculate the design flow of the pump based on the ten year storm. The pump will be <br /> an off-the-shelf manufactured product that can convey the contributing ten year storm —no <br /> custom mechanical pump design is included in this scope. The pump plans will call out the <br /> specific pump model number and manufacturer with an "or approved equal" qualifier. RRM's <br /> electrical engineering subconsultant, Zeiger Engineering, will provide electrical engineering <br /> design to provide a power source to the pump. <br /> The pump will be housed in a below-grade box specified by the pump's manufacturer, City- <br /> standard utility box, County-standard utility box, or Caltrans-standard utility box— no custom <br /> structural pump enclosure is included in this scope. <br /> Stormwater Pollution Prevention Plan SWPPP <br /> A project SWPPP is required for this project (more than one acre of disturbed land). RRM will <br /> prepare plans for temporary erosion control facilities. Temporary facilities will be proposed for <br /> the protection of graded areas and drainage devices. Details and appropriate notes for <br /> construction best management practices (BMP) and guidelines for implementation are proposed <br /> to be in conformance with the State of California Water Resources Board requirements and the <br /> approved staff report, including sediment control recommendations. <br /> The temporary erosion control plans will be incorporated into the project improvement plans <br /> as well as into the project SWPPP. RRM will conduct a risk determination based on the project's <br /> topography, soil, schedule, location, and receiving water then prepare the SWPPP based on the <br /> project-specific risk level. The SWPPP will be based on the 100% PS&E submittal. This task <br /> includes preparing permit registration documents using the SMARTS database for certification <br /> by the Client and submittal to the Water Boards. The City will initiate the project in SMARTS. <br /> This task does not include construction monitoring, QSP services, or SWPPP updates during <br /> construction. <br /> Construction Plan <br /> Construction plans for the overall skatepark design and surrounding amenities layout with a <br /> keynoting system that identifies all construction items, references to appropriate details, and <br /> drawing series directions. This plan will include and annotate all skate and site features, walls, <br /> hardscape, paving materials, ramps, stairs, fences, handrails, and lighting. Design assumes Fire <br /> Department will utilize the proposed and existing parking lots as the access roads. <br />