My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 4:01:10 PM
Creation date
6/2/2022 4:00:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> rrm April 20, 2022 <br /> design Page 4of9 <br /> group <br /> Site Electrical/Lighting Plans <br /> RRM's subconsultant, Zeiger Engineering, will prepare electrical service distribution plans, <br /> circuiting, fixture schedules, panel schedules, and electrical calculations as required to provide <br /> electrical service for site lighting, skatepark lighting, irrigation controller, and the pump lift <br /> station in the skatepark. Preparation of Title 24 Lighting compliance for exterior lighting is <br /> included. This scope assumes that the existing on-site electrical service is adequate for the <br /> proposed improvements and a new utility application for the extension of new service is not <br /> required. <br /> Construction Details <br /> Details for all construction items illustrated on the construction plans. The details will specify <br /> materials, dimensions, colors, and finishes and will be keyed to the plan. Pavement and flatwork <br /> design will be based on the project geotechnical report's recommendations. Project will utilize <br /> City-standard plans and details for curb ramps, sidewalks, signs, driveways, and other hardscape <br /> features. <br /> Structural Details and Calculations <br /> Structural plans, details, and calculations for all required features in the park such as the site <br /> walls and shade shelter footings. <br /> Irrigation Plans and Details <br /> Irrigation plans will detail the system layout, mainline, automatic controller, head layout, piping, <br /> filter, and backflow device for recycled water irrigation. In support of the irrigation plans, we will <br /> prepare irrigation details that specify the method of construction and proper irrigation system <br /> component procedures. The irrigation plan will comply with requirements in the City of <br /> Pleasanton Model Water Efficient Landscape Ordinance. <br /> Planting Plans and Details <br /> Layout of all planting indicating plant species, quantity, size and location of all shrubs, ground <br /> cover, and trees. In support of the planting plans, we will prepare planting details that specify the <br /> method of construction and proper planting procedures. The planting plan will comply with <br /> requirements in the City of Pleasanton Model Water Efficient Landscape Ordinance. <br /> Specifications <br /> Technical specifications (CSI format, Division 02 through 32, as applicable) will be provided as <br /> part of the submittals listed in the tasks below. This scope assumes the City will provide and <br /> assemble all general provisions related to this project. 50% PS&E submittal will include outline <br /> specifications only. <br /> Construction Cost Opinions <br /> RRM's subconsultant, TBD Consulting, will prepare a construction cost opinion for the park at <br /> the 50%, 90%, and final bid-ready stage. The detailed construction cost opinion will break out <br /> each component of the design with item descriptions and unit costs. Due to many variables <br />
The URL can be used to link to this page
Your browser does not support the video tag.