Laserfiche WebLink
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> rrm April 20, 2022 <br /> design Page 4of9 <br /> group <br /> Site Electrical/Lighting Plans <br /> RRM's subconsultant, Zeiger Engineering, will prepare electrical service distribution plans, <br /> circuiting, fixture schedules, panel schedules, and electrical calculations as required to provide <br /> electrical service for site lighting, skatepark lighting, irrigation controller, and the pump lift <br /> station in the skatepark. Preparation of Title 24 Lighting compliance for exterior lighting is <br /> included. This scope assumes that the existing on-site electrical service is adequate for the <br /> proposed improvements and a new utility application for the extension of new service is not <br /> required. <br /> Construction Details <br /> Details for all construction items illustrated on the construction plans. The details will specify <br /> materials, dimensions, colors, and finishes and will be keyed to the plan. Pavement and flatwork <br /> design will be based on the project geotechnical report's recommendations. Project will utilize <br /> City-standard plans and details for curb ramps, sidewalks, signs, driveways, and other hardscape <br /> features. <br /> Structural Details and Calculations <br /> Structural plans, details, and calculations for all required features in the park such as the site <br /> walls and shade shelter footings. <br /> Irrigation Plans and Details <br /> Irrigation plans will detail the system layout, mainline, automatic controller, head layout, piping, <br /> filter, and backflow device for recycled water irrigation. In support of the irrigation plans, we will <br /> prepare irrigation details that specify the method of construction and proper irrigation system <br /> component procedures. The irrigation plan will comply with requirements in the City of <br /> Pleasanton Model Water Efficient Landscape Ordinance. <br /> Planting Plans and Details <br /> Layout of all planting indicating plant species, quantity, size and location of all shrubs, ground <br /> cover, and trees. In support of the planting plans, we will prepare planting details that specify the <br /> method of construction and proper planting procedures. The planting plan will comply with <br /> requirements in the City of Pleasanton Model Water Efficient Landscape Ordinance. <br /> Specifications <br /> Technical specifications (CSI format, Division 02 through 32, as applicable) will be provided as <br /> part of the submittals listed in the tasks below. This scope assumes the City will provide and <br /> assemble all general provisions related to this project. 50% PS&E submittal will include outline <br /> specifications only. <br /> Construction Cost Opinions <br /> RRM's subconsultant, TBD Consulting, will prepare a construction cost opinion for the park at <br /> the 50%, 90%, and final bid-ready stage. The detailed construction cost opinion will break out <br /> each component of the design with item descriptions and unit costs. Due to many variables <br />