Laserfiche WebLink
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> rrm April 20, 2022 <br /> • <br /> esign Page 2 of 9 <br /> group <br /> Horizontal Control Plans <br /> The plans will establish all horizontal control for the Skatepark and surrounding amenities. The <br /> plans will also identify construction layout control points and a coordinate system for locating <br /> site elements. Note that the horizontal control plans are not included in the 60% PS&E <br /> submittal. <br /> Site Utility Plans <br /> Utility plans for water and storm drain begin at the upstream ends of each utility within the <br /> project limits to the downstream connections at the existing service mains, assumed to be <br /> directly adjacent to the project. Water utilities are for a drinking fountain and the storm drain is <br /> for connecting proposed storm drain and stormwater treatment measures to the existing <br /> downstream storm drain system. This scope assumes that existing off-site and/or on-site utility <br /> systems have adequate capacity and meters for the proposed project—analysis of existing <br /> utilities' capacities and design of any improvements beyond the point of connection are not <br /> included in this scope. This task assumes one proposed fire hydrant located near the existing or <br /> proposed parking lot will suffice for Fire Code/Fire Department compliance—fire supply line is <br /> assumed to be fed by existing on site meter. <br /> Grading. Drainage and Stormwater Plans <br /> The plans will show all vertical control of the project elements, contour grading, spot elevations, <br /> and cut and fill estimates within the project site. The plans will detail all drainage facilities within <br /> the site. This scope is limited to the project site only (approximately three acres) and assumes <br /> that the existing off-site upstream and downstream storm drain infrastructure has adequate <br /> capacity for the proposed site development, and analysis or upgrades to this infrastructure is not <br /> included. Stormwater evaluation to include the following: <br /> • This project is assumed to create and/or replace more than 10,000 square feet of <br /> impervious surface and is a C.3 Regulated Project. RRM will design permanent <br /> stormwater treatment in accordance with the C.3 Stormwater Technical Guidance (C.3 <br /> Guide, February 2021). Per Appendix I of the C.3 Guide, this project is in a <br /> hydromodification susceptible area—this task assumes the project will require <br /> hydromodification measures using Bay Area Hydrology Model 2013 (BAHM) for sizing. <br /> The design will utilize a combination of low impact development (e.g., interceptor tree <br /> credits, self-retaining areas, self-treating areas) and stormwater treatment measures <br /> (e.g., bioretention, pervious pavements). RRM will prepare a City of Pleasanton <br /> Stormwater Requirements Checklist and C.3 sizing calculations <br /> • RRM will perform ten year storm drainage analyses (hydrology and hydraulic) for the <br /> project drainage, pump, and Stormwater designs. The pump will be designed to pump <br /> stormwater collected by the skate park's drainage system to the proposed stormwater <br /> treatment measures. The C.3 calculations and exhibits, storm drain hydrologic/hydraulic <br /> calculations and exhibits, reference documentation, and project narrative will be <br /> provided in a comprehensive drainage and stormwater control plan <br />