My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 4:01:10 PM
Creation date
6/2/2022 4:00:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> April 20, 2022 <br /> rrm : <br /> design Page 6of9 <br /> group <br /> Subtask A.3: Quality Control Review <br /> RRM will perform an internal review of the construction documents concurrent with the City's <br /> review of the 90% complete submittal. This QA/QC review process will be performed by <br /> senior-level professionals that are not directly involved in the project to provide an independent <br /> perspective. <br /> Deliverables: <br /> • Internal QA/QC review <br /> Subtask AA 507o PS&E <br /> RRM will prepare a 50% progress submittal for the City to review. The intent of this submittal is <br /> to verify that the design direction is aligned with the City's expectations. The City will provide <br /> comments in writing for RRM to respond to. <br /> Deliverables: <br /> • SO% PS&E submittal <br /> Subtask A.5: 90% PS&E <br /> RRM will prepare 90% PS&E package for submittal to the City for building permit review. The <br /> City is responsible for submitting to all relevant departments, consolidating the various <br /> comments into a single list document, and reconciling conflicting comments from different plan <br /> reviewers. <br /> Deliverables: <br /> • 90% PS&E submittal <br /> Subtask A.6: 100% PS&E <br /> RRM will update the PS&E package based on City plan-check comments and our internal <br /> QA/QC review and resubmit to the City for back-checking. <br /> Deliverables: <br /> • 100% PS&E submittal <br /> I <br /> Subtask A.7: Bid-Ready PS&E <br /> When the plans are approved through all relevant departments, RRM will prepare and package <br /> the bid-ready PS&E submittal including bid alternates as determined through the phasing strategy <br /> plan and submit electronically to the City. Please note that `front-end' specifications are the <br /> responsibility of the City including general provisions. <br /> Deliverables: <br /> • Bid-Ready PS&E submittal <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.