My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
060722
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2022 4:01:10 PM
Creation date
6/2/2022 4:00:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
6/7/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ken Mercer Sports Park Skatepark Construction Documents <br /> Scope of Services <br /> rrm April 20, 2022 <br /> de ! Page 7 of 9 <br /> group <br /> E Subtask A.8: Permit Processing Assistance <br /> RRM will assist the City's project manager during the permit review process. This assistance <br /> could include providing written clarifications, preparing exhibits, or attending extra meetings <br /> (such as with the City Building Official or Fire Marshal, etc.) at the request of the City. <br /> Due to the unknown nature of the level of effort that might be required, the task allows for 24- <br /> hours of support. <br /> Deliverables: <br /> • 24-hours of support during permitting review process <br /> LIMITATIONS OF SCOPE AND EXCLUSIONS <br /> Please note that the tasks to be performed by the RRM team are limited purely to those <br /> outlined above. Substantive changes requested by the Client or changes in the Client's program <br /> or direction that are inconsistent with prior approvals are subject to additional services fees. <br /> Any additional services that RRM Design Group is asked to perform over and beyond those <br /> described above will be billed on a negotiated and Client-approved, fixed-fee, or hourly basis. <br /> The following services or tasks are specifically excluded from the scope: <br /> • Environmental (CEQA) processing, IS/MND, or EIR document <br /> • State and Federal Agency processing and permits <br /> • Permit fees and applications <br /> • New utility service or existing service upgrade applications <br /> • Bid support <br /> • Construction administration, design services through construction <br /> • Technical studies other than those listed in this proposal <br /> • Arborist report <br /> • Traffic studies and control plans <br /> • Potholing to verify utilities <br /> • Hazmat testing <br /> • Analysis of and design of the existing off-site storm drainage facilities and conditions <br /> • SWPPP construction monitoring, QSP services, or SWPPP updates during construction <br /> • Analysis of off-site sewer, water, and storm drain utility capacities <br /> • Architectural buildings <br /> • Traffic control <br /> • CLOMR, LOMR <br /> • Fire Department access road <br /> • Custom mechanical pump design <br /> • CCTV surveillance systems <br /> • WAP (wireless access point) and data communication system <br /> • Electric Vehicle Charging Stations <br />
The URL can be used to link to this page
Your browser does not support the video tag.