Laserfiche WebLink
c. Public right-of-way across the western and southern frontages of Parcel A <br /> shall be dedicated to the City for Alisal Street, including a radius return at <br /> the southwest corner. This will include the portion of the 40' right-of-way <br /> previously dedicated to Alameda County on 10-14-1927 as Series No. X- <br /> 78875 (Book 1685 Page 397), as well as the 21.9' width shown on the <br /> Vesting Tentative Map. The exact dedication to be subject to verification by <br /> a site survey. <br /> d. Public right-of-way across the southern frontages of Lots 12 to 15 shall be <br /> dedicated to the City for Westbridge Lane in the area labeled "Ex. 16.5' <br /> Private Road" on the Vesting Tentative Map unless existing public rights <br /> can be confirmed. <br /> e. Abutter's rights shall be relinquished across the Westbridge Lane frontage <br /> of Lot 12. <br /> f. 10'-wide Public Service Easements (PSE) shall be dedicated according to <br /> Pleasanton Municipal Code §19.36.110 across all public street frontages <br /> including both sides of Spotorno Ranch Drive (exhibits currently show 6' <br /> PSE), the west and south frontages of Parcel A (Alisal Street), and the <br /> south frontages of Lots 12 to 15 (Westbridge Lane). In addition to the 10'- <br /> wide PSEs, a wider PSE shall be dedicated near the southwest corner of <br /> Parcel A near the City's existing sanitary sewer lift station to allow parking <br /> of two standard-sized maintenance trucks and staging for periodic <br /> maintenance of said station. (PROJECT SPECIFIC CONDITION) <br /> 81. GEOTECHNICAL CONSULTANT — CERTIFICATION OF CONSTRUCTION <br /> OF SUBDIVISIONS: The applicant's California licensed geotechnical engineer <br /> shall inspect and approve the construction of all foundations, retaining walls, <br /> drainage and geotechnical aspects of the development to ensure compliance <br /> with the approved grading and improvement plans. The geotechnical engineer <br /> shall be present on-site during grading and excavation operations and certify <br /> on the as-built plans that the inspection results and the as-built conditions of <br /> the development were constructed in general compliance with the project <br /> geotechnical report and improvement plans. The results of the inspections <br /> shall be submitted to the Director of Engineering/City Engineer prior to the <br /> issuance of the certificate of occupancy. The applicant shall bear all costs for <br /> work related to this condition by their geotechnical engineer. (Address this <br /> condition prior to tract acceptance) (PROJECT SPECIFIC CONDITION) <br /> 82. RIGHT OF ENTRY: The applicant shall furnish written proof of all necessary <br /> rights-of-entry, permits and/or easements for the construction of off-site <br /> temporary or permanent improvements to the Director of Engineering/City <br /> Engineer prior to the issuance of permits. (Address this condition prior to final <br /> map approval) <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 22 of 30 <br />