My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
030122
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 9:01:28 AM
Creation date
2/24/2022 9:01:11 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c. The downstream end of the gully on Parcel C (north of Lot 8) terminates <br /> in a wetland feature. Storm water discharge from this feature shall be <br /> directed to the proposed storm inlet located approximately 100' to the <br /> southwest. Because a significant tributary area contributes storm water <br /> to this feature, the design shall assure storm water is contained, <br /> captured, and directed to the pipe network. <br /> d. Sections C and F on the Vesting Tentative Map show a "Grassy Swale" <br /> along the proposed trail for Parcel B. A field inlet shall be provided at the <br /> downstream (western) end of this grassy swale to discharge any <br /> stormwater that does not percolate to the underlying soil. <br /> e. The Happy Valley Specific Plan , Chapter VII "Public Facilities", Section C <br /> "Storm Drainage", subsection 2d "Alisal Street Area and Spotorno Flat <br /> Area Drainage and Proposed Improvements", requires correction of the <br /> following deficiencies: <br /> i. Limited flooding occurs along Alisal Street at a low point along the <br /> Faith Chapel frontage. The primary cause of this is an undersized <br /> street culvert. <br /> ii. Poorly defined and incomplete roadside "V" ditches compound <br /> drainage problems in this area. The applicant shall redefine and rip- <br /> rap line all "V" ditches along the property frontages to improve <br /> roadside drainage. <br /> f. A connection between the discharge end of a new 36" storm pipe within <br /> Parcel A to the existing pipe beneath Alisal Street is proposed. The <br /> applicant shall confirm that the condition of the existing pipe is <br /> serviceable. If repairs are needed, the applicant shall complete said <br /> repairs prior to connecting. Because the existing pipe daylights at the <br /> east side of Alisal Street, a new pipe connection will require a junction <br /> structure with side openings to receive storm flows from the existing <br /> roadside "V" ditch along Alisal Street. (PROJECT SPECIFIC <br /> CONDITION) <br /> 45. MANHOLES: Referring to the Vesting Tentative Map, the curvilinear alignment <br /> of Spotorno Ranch Road at Lots 6 to 10 and 17 to 18 prompted the use of <br /> numerous manholes at close spacing. The design shall utilize manufacturer- <br /> allowed joint deflection at each storm drain and sanitary sewer pipe segment to <br /> reduce the number of manholes to the extent feasible. (Address this condition <br /> prior to improvement plan approval) (PROJECT SPECIFIC CONDITION) <br /> 46. GRADING/CONFORM ISSUES: Referring to the Vesting Tentative Map, the <br /> following grading issues shall be reconsidered in the design (Address this <br /> condition prior to improvement plan approval): <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 12 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.