Laserfiche WebLink
41 . WATER FEES AND WATER METER CONNECTION FEES: The applicant shall <br /> pay the applicable Zone 7 and City connection fees and water meter cost for <br /> any water meters and irrigation meters, if applicable, prior to building permit <br /> issuance. Such fees include, but are not limited to, the pro-rata share of costs <br /> associated with Happy Valley water system improvements as defined in City <br /> Council Resolution 19-1102 and included in the City's adopted Fee Schedule. <br /> (PROJECT SPECIFIC CONDITION) <br /> 42. SEWER FEES: The applicant shall pay the applicable Dublin-San Ramon <br /> Services District (DSRSD) and City sewer permit fees prior to building permit <br /> issuance. Such fees include, but are not limited to, the pro-rata share of <br /> associated with Happy Valley sewer system improvements as defined in City <br /> Council Resolution 19-1102 and included in the City's adopted Fee Schedule. <br /> (PROJECT SPECIFIC CONDITION) <br /> 43. SCHOOL IMPACT FEES: Applicant shall work with the Pleasanton Unified <br /> School District (PUSD) to develop a program to offset this project's long term <br /> effect on school facility needs in Pleasanton. This program shall be designed to <br /> fund school facilities necessary to offset this project's reasonably related effect <br /> on the long-term need for expanded school facilities. The method and manner <br /> for the provision of these funds and/or facilities shall be approved by the PUSD <br /> and in place prior to building permit issuance. Written proof of compliance with <br /> this condition shall be provided by applicant to the City, on a form generated by <br /> the PUSD, prior to building permit issuance. <br /> ENGINEERING DEPARTMENT — LAND DEVELOPMENT — 925-931-5650 <br /> 44. DRAINAGE IMPROVEMENTS: Referring to the Vesting Tentative Map, the <br /> following drainage improvements shall be incorporated into the design (Address <br /> this condition prior to improvement plan approval): <br /> a. Trash racks shall be provided for the two storm inlets that serve the "V" <br /> ditch behind Lots 8 to 12 to capture woody debris without obstructing <br /> flows. A private storm drain easement (PSDE) shall be granted by the <br /> Parcel C owner to the homeowners association to allow association <br /> maintenance of the ditch and trash racks. <br /> b. Emergency overland release flow pathways shall be provided along the <br /> common property line separating Lots 7 and 8/9 as well as the common <br /> property line separating Lots 9 and 10. The overland release shall <br /> contain and direct storm waters to Spotorno Ranch Drive across the <br /> surface without inundating the homes on Lots 7 and 9. The flow <br /> pathways must function as a back-up route for storm water in the event <br /> the buried storm pipes beneath become plugged or fail to contain the <br /> flows. <br /> PUD-138 and VTM 8616 Planning Commission <br /> Page 11 of 30 <br />