My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
030122
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 8:59:12 AM
Creation date
2/24/2022 8:59:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the Director of Engineering/City Engineer prior to formal approval of the parcel <br /> map for recordation. <br /> 46. WARRANTY BOND: The applicant shall guarantee the installed subdivision <br /> improvements by submitting a warranty bond, or other improvement security <br /> acceptable to the Director of Engineering/City Engineer. Said bond shall be in an <br /> amount equal to 10 percent of the Engineer's Estimate of the improvement costs <br /> as approved by the Director of Engineering/City Engineer. <br /> 47. RECORDATION: The applicant's title company shall record the map at the <br /> Alameda County Clerk-Recorder's Office. Upon recordation, the title company <br /> shall an 18-inch X 26-inch mylar with recording information to the Director of <br /> Engineering/City Engineer. <br /> 48. STORMWATER TREATMENT: The project creates and/or replaces 10,000 <br /> square feet or more of impervious surface (collectively over the entire project <br /> site) and shall therefore comply with Section "C.3.b Regulated Projects" of the <br /> NPDES Permit No. CAS612008 and amendments issued by the San Francisco <br /> Bay Regional Water Quality Control Board. The improvement plans shall include <br /> a Stormwater Management Plan prepared by a California licensed civil engineer, <br /> indicating the type and locations of stormwater treatment measures to be <br /> installed (numbered sequentially for identification purposes), and sizing <br /> calculations. The Stormwater Management Plan shall be subject to review and <br /> acceptance by the Director of Engineering/City Engineer, prior to the issuance of <br /> an engineering or building permit, whichever occurs first. <br /> 49. STORMWATER TREATMENT MEASURES INSPECTION AND MAINTENANCE <br /> AGREEMENT: The applicant shall enter into a "Stormwater Treatment Measures <br /> Inspection and Maintenance Agreement" for annual maintenance and reporting <br /> of the stormwater treatment system as depicted on the City-approved <br /> improvement plans. The agreement shall be filed for record at the Alameda <br /> County Clerk-Recorder's Office at a time determined by the Director of <br /> Engineering/City Engineer. <br /> 50. STATE OF CALIFORNIA CONSTRUCTION GENERAL PERMIT: A "Notice of <br /> Intent" (NOI) and "Stormwater Pollution Prevention Plan" (SWPPP) shall be <br /> prepared for construction projects disturbing 1 acre or more of land (including <br /> smaller sites that are part of a larger common plan of development). The <br /> applicant shall include the Waste Discharger Identification Number (WDID) on <br /> the title sheet of the improvement plans and provide proof of coverage under the <br /> State of California Construction General Permit to the Engineering Department <br /> prior to the approval of the improvement plans by the Director of Engineering/City <br /> Engineer. <br /> 51 . MONUMENTS: The Parcel Map shall indicate survey monuments (iron pipes with <br /> caps) to be set where the proposed common property line separating Parcels 1 <br /> and 2 meet the north and south property boundary in accordance with §66495- <br />
The URL can be used to link to this page
Your browser does not support the video tag.