My WebLink
|
Help
|
About
|
Sign Out
14 ATTACHMENT 1-5
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
021522
>
14 ATTACHMENT 1-5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2022 11:41:13 AM
Creation date
2/10/2022 10:22:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/15/2022
DESTRUCT DATE
15Y
Document Relationships
14
(Message)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix A - E
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
14 ATTACHMENT 6 - Appendix F - I
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2022\021522
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />PUD-138 and VTM 8616 Planning Commission <br />Page 30 of 30 <br />shall be placed benefitting the City prior to recordation of the final map. <br />(PROJECT SPECIFIC CONDITION) <br /> <br />121. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best <br />management practices to minimize traffic impacts shall be used during <br />construction, including scheduling of major truck trips and deliveries, to avoid <br />peak travel hours. The TCP shall have proper lane closure procedures such as <br />flagger stations, signage, cones, and other warning devices implemented during <br />construction. The TCP shall also include time of day/hours of lane closures and <br />total number of days. (PROJECT SPECIFIC CONDITION) <br /> <br />122. TRUCK ROUTES: The haul route for all materials to and from the project site <br />shall be reviewed and approved by the City Traffic Engineer prior to building <br />permit issuance and shall include the provision to monitor the street surfaces <br />used for the haul route so that any damage and debris attributable to the haul <br />trucks is identified and corrected at the expense of the applicant. <br /> <br />[end]
The URL can be used to link to this page
Your browser does not support the video tag.