Laserfiche WebLink
<br />PUD-138 and VTM 8616 Planning Commission <br />Page 30 of 30 <br />shall be placed benefitting the City prior to recordation of the final map. <br />(PROJECT SPECIFIC CONDITION) <br /> <br />121. TRAFFIC CONTROL PLAN (TCP): A comprehensive traffic control plan shall be <br />submitted to the City Traffic Engineer for review and approval. Best <br />management practices to minimize traffic impacts shall be used during <br />construction, including scheduling of major truck trips and deliveries, to avoid <br />peak travel hours. The TCP shall have proper lane closure procedures such as <br />flagger stations, signage, cones, and other warning devices implemented during <br />construction. The TCP shall also include time of day/hours of lane closures and <br />total number of days. (PROJECT SPECIFIC CONDITION) <br /> <br />122. TRUCK ROUTES: The haul route for all materials to and from the project site <br />shall be reviewed and approved by the City Traffic Engineer prior to building <br />permit issuance and shall include the provision to monitor the street surfaces <br />used for the haul route so that any damage and debris attributable to the haul <br />trucks is identified and corrected at the expense of the applicant. <br /> <br />[end]