Laserfiche WebLink
i <br /> • TIC standard CADD format shall be used for drawing production. <br /> • Suitable CADD files shall be provided to TJC by PCG for use as backgrounds on electrical <br /> site plans. <br /> • All interim design drawings, specifications, and opinion of probable costs will be <br /> submitted in electronic (PDF)files. <br /> • Engineering services during construction is not included. <br /> 1 <br /> Deliverables <br /> Design deliverables will include plans, specifications, and opinion of probable cost for the draft <br /> submittal; stamped and signed plans, specifications, calculations, and opinion of probable cost <br /> for the final design package. The final design package will incorporate appropriate client <br /> comments based on the previous submittal. An anticipated drawing list for the electrical work is <br /> as follows: <br /> GE-1- Electrical Symbols, Abbreviations and Installation Details <br /> E-1- Electrical Single Line Diagrams and Control Schematic <br /> E-2- Electrical Plan Drawing and Photographs (North) <br /> E-3- Electrical Plan Drawing and Photographs (South) <br /> Specifications will include the following technical section coordinated by TIC with the City's front- <br /> end documents: <br /> Section 16000 General Electrical Requirements <br /> 100%Submittal Coordination <br /> We are requesting a budget increase of up to 18 hours to 1) obtain park electrical design record <br /> plans (Sheet E1.0, E1.1, E3.0 to E3.2), 2) coordinate/ attend site meeting (excluded from TJC's <br /> Task No. 1.2.1) with City staff to obtain access and provide TJC detailed photographs of existing <br /> conditions for Festival Power Pedestal Nos. 3 & 5 to confirm supply circuit availability for <br /> establishing motor starter/control panel location, and 3) coordinate findings with TJC to finalize <br /> the pump station power supply design. We understand any additional efforts to document the <br /> existing power supply conditions will be provided by City staff. The 65% plans submittal will be <br /> carried to 100% completion. Appropriate modifications will be made to the plans, details, and <br /> included with the cost estimate. <br /> Task 1.2.2—Package Pump Station Bid Support Services <br /> TIC will assist with answering bidder questions for ICE related issues <br /> Assumptions <br /> • Two written responses to requests for clarification to the Contract Documents are <br /> included. <br /> • Production and distribution of the final signed and stamped plans and <br /> specifications package to prospective bidders shall be by Others. <br /> • Pre-bid meeting attendance is not included. <br /> • Formal incorporation of addenda,e.g., conformed drawings, is not included. <br /> January 5,2022—Page 3 <br /> Saklaen—Addendum No.1 Budget Increase Val Vista Park Underdrain System <br />