My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2022
>
020122
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2022 3:15:50 PM
Creation date
1/26/2022 3:15:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/1/2022
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21457. The total cost of the project (including the additional scope of work) is estimated <br /> to stay within the $1.6 million-dollar budget. <br /> Schedule <br /> The proposed schedule for the project is as follows: <br /> Approval of Task Authorization February 1, 2022 <br /> Final Plans & Specifications April 12, 2022 <br /> Start of Construction: Summer 2022 <br /> End of Construction: Spring 2023 <br /> As envisioned, the storm drain outfall repairs will occur first, during the summer months. <br /> The repairs will be complete and in operation by the beginning of the wet season of 2022. <br /> The repaired storm drain outfalls will be available to serve the underdrain system during <br /> the wet weather. The underdrain discharge and pump system will be constructed over the <br /> winter when park use is lighter and be ready for service in spring 2023 when irrigation <br /> with recycled water resumes. <br /> Submitted by: Fisc Review: Approved by: <br /> tk- <br /> Stephen Kirkpatrick Tina Olson Brian Dolan <br /> Director of Engineering Director of Finance Interim City Manager <br /> Attachments: <br /> 1. Proposal from Pakpour Consulting Group for Budget Increase <br /> Page 4 of 4 <br />