Laserfiche WebLink
Environmental Checklist <br />Transportation <br /> <br />Draft Initial Study – Negative Declaration 79 <br />Cumulative Impacts <br />The cumulative projects scenario is overall General Plan buildout for Pleasanton in 2025 plus <br />Pleasanton population projections through 2045. Implementation of CAP 2.0 projects, in <br />combination with other cumulative projects anticipated under Pleasanton General Plan buildout, <br />could result in increases in VMT or changes affecting traffic design safety and emergency access. <br />However, the CAP 2.0 is a policy document containing programs that are consistent with the <br />Pleasanton General Plan and does not propose new development that would require the <br />provisioning of new roadways. The CAP 2.0 strategies and actions promote alternative modes of <br />transportation and reduction of VMT throughout Pleasanton, consistent with goals contained in the <br />Pleasanton General Plan Circulation Element and Pleasanton Bicycle and Pedestrian Master Plan.9091 <br />Therefore, the CAP 2.0 would result in a less-than-significant cumulative impact related to <br />transportation. <br /> <br /> <br /> <br />90 Pleasanton, City of. 2009. General Plan Circulation Element. Available: <br /><https://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=23898>. Accessed October 15, 2021. <br />91 Pleasanton, City of. 2018. Bicycle and Pedestrian Master Plan. Available: <br /><http://www.cityofpleasantonca.gov/civicax/filebank/blobdload.aspx?BlobID=32630>. Accessed October 15, 2021.