Laserfiche WebLink
Page 2 of 6 <br /> <br />Color orthophoto image(s) have been included in this proposal. Orthophotography <br />will be delivered in tif/tfw format with a pixel resolution of 0.25 feet, (approximately <br />2000 dpi). Also, image files of the photos (negatives) taken from the plane showing <br />the site and surrounding areas will be provided to the Client in electronic (.JPG) <br />format, if requested. However, unlike the color .tif image files of the mapping limits, <br />the negatives showing extensive surrounding area will not be orthorectified. <br /> <br /> <br />TASK 1.3 – SUPPLEMENTAL (GROUND) SURVEYS AND MAPPING <br /> <br />For all areas within the “orange” limits shown on the Google Earth Image <br />attached for the pipeline areas: <br /> <br />LCC will perform ground level surveys within the project limits described above in <br />order to attempt to locate all above ground utility structures, (e.g. valve boxes, <br />vaults, manholes, inlets, lights, traffic poles, misc. boxes, drain inlets, exposed <br />conduits and pipes, overhead wires, etc.) which are associated with above and <br />below ground utilities. The survey will be limited to those structures and features <br />which are within the public ROW (or easement) and which are readily visible. <br />Survey work will include opening and “dipping” sewer and storm drain structures in <br />order to obtain invert elevations, and approximate pipe sizes and general directions <br />will be noted. See below for more detailed explanation and traffic control for <br />“dipping” work. Although we cannot request USA to mark underground utilities, we <br />assume that some areas will have utility markings from past or adjacent projects, <br />which we will include in our ground survey. <br /> <br />Cross sections shall be taken in 50-ft to 100-ft increments along curb (or shorter <br />increments as appropriate per the existing terrain/alignment). Cross section data <br />will be collected from face-of-curb to face-of-curb and will only capture roadway <br />surface features. The survey will not include any points behind the curb EXCEPT <br />for any utilities behind the curb but still in the public right-of-way, as described <br />above. <br /> <br />At intersections, we will capture the following points along the face of curb at all four <br />corners: Beginning of curb return; 1/4 of curb return (at large returns only); 1/2 of <br />curb return; 3/4 of curb return (at large returns only); End of curb return. <br /> <br /> <br />In addition to the utilities and standard cross section ground surveys described <br />above, LCC will perform “Detailed Supplemental Surveys” at the following <br />locations (as outlined in “red” on the Google Earth image attached): <br /> <br />1. New Well 9 and connecting pipeline to Santa Rita Road (exact <br />ground survey alignment TBD). <br /> <br />2. Existing Well 5 (to be abandoned) and parking lot area to the north, in <br />addition to New Well 10 and Existing Well 6. <br /> <br />3. Portion of Centralized Treatment facility including Rehabilitated Well 8. <br />