My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
120721
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 4:15:11 PM
Creation date
12/1/2021 4:14:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/7/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> NOVEMBER 2021 | 12 <br />Task 9.0 – Outside Agency Permit Applications and Reviews <br />Carollo will coordinate and prepare the outside agency permits listed below under this task. Carollo will <br />incorporate requirements of each permit into the design of the project. <br />Task 9.1 – Division of Drinking Water Permitting for CTF <br />The City’s Domestic Water Supply permit will require an amendment to include the PFAS Centralized <br />Treatment Facility (CTF). This task includes up to three (3) meetings with DDW Project Manager to discuss <br />and coordinate permit amendment requirements. The following submittals are anticipated as part of the <br />permitting effort: <br />· PFAS Bench Test Plan <br />· Technical Report (including Operations Plan and Operator Certification Requirements) <br />· 95 percent Engineering Plans and Specifications <br />· DWS Permit Amendment Application Form <br />Task 9.2 – Alameda County Flood Control and Water Conservation District (Zone 7 Water <br />Agency) and DDW Permit Applications for Wells 9 and 10 <br />LSCE will prepare the required DDW submittal for Wells 9 and 10. The detailed scope of work for this task is <br />included in Attachment E Task 9.2.A. <br />Zone 7 is the administrative agency for Alameda County’s Water Well Ordinance. LSCE will prepare permit <br />applications (including related engineering reports) for new Wells 9 and 10. The detailed scope of work for <br />this task is included in Attachment E Task 9.2.B. <br />Task 9.3 – Bay Area Air Quality Management District (BAAQMD) Permit Applications <br />Carollo will prepare engine permit applications/registrations for permanent and portable generators to be <br />obtained for the project. <br />Task 9.4 – Pacific Gas and Electric (PG&E) Service Applications <br />Pezzoni Engineering will prepare the electrical power service applications for Well 9, Well 10, and Well 8/CTF. <br />The service applications will be submitted when we begin 95 percent design. <br />Task 9.5 – Pleasanton Unified School District (PUSD) Coordination – Alisal Elementary <br />The City will lead discussions and negotiations with PUSD to summarize the project, potential construction <br />impacts, construction sequencing, and potential temporary construction easements at Alisal Elementary <br />School. Carollo will support the City in discussions with PUSD and provide technical information related to the <br />project for construction of facilities at both school sites. Carollo will incorporate requirements into the <br />design. <br />Task 9.6 – Permit to Abandon Wells 3, 4, 5 and 6 <br />LSCE will prepare the Zone 7 Water Agency permit applications for destruction of Wells 3, 4, 5 and 6. The <br />detailed scope of work for this task is included in Attachment E Task 9.6.
The URL can be used to link to this page
Your browser does not support the video tag.