Laserfiche WebLink
<br /> NOVEMBER 2021 | 12 <br />Task 9.0 – Outside Agency Permit Applications and Reviews <br />Carollo will coordinate and prepare the outside agency permits listed below under this task. Carollo will <br />incorporate requirements of each permit into the design of the project. <br />Task 9.1 – Division of Drinking Water Permitting for CTF <br />The City’s Domestic Water Supply permit will require an amendment to include the PFAS Centralized <br />Treatment Facility (CTF). This task includes up to three (3) meetings with DDW Project Manager to discuss <br />and coordinate permit amendment requirements. The following submittals are anticipated as part of the <br />permitting effort: <br />· PFAS Bench Test Plan <br />· Technical Report (including Operations Plan and Operator Certification Requirements) <br />· 95 percent Engineering Plans and Specifications <br />· DWS Permit Amendment Application Form <br />Task 9.2 – Alameda County Flood Control and Water Conservation District (Zone 7 Water <br />Agency) and DDW Permit Applications for Wells 9 and 10 <br />LSCE will prepare the required DDW submittal for Wells 9 and 10. The detailed scope of work for this task is <br />included in Attachment E Task 9.2.A. <br />Zone 7 is the administrative agency for Alameda County’s Water Well Ordinance. LSCE will prepare permit <br />applications (including related engineering reports) for new Wells 9 and 10. The detailed scope of work for <br />this task is included in Attachment E Task 9.2.B. <br />Task 9.3 – Bay Area Air Quality Management District (BAAQMD) Permit Applications <br />Carollo will prepare engine permit applications/registrations for permanent and portable generators to be <br />obtained for the project. <br />Task 9.4 – Pacific Gas and Electric (PG&E) Service Applications <br />Pezzoni Engineering will prepare the electrical power service applications for Well 9, Well 10, and Well 8/CTF. <br />The service applications will be submitted when we begin 95 percent design. <br />Task 9.5 – Pleasanton Unified School District (PUSD) Coordination – Alisal Elementary <br />The City will lead discussions and negotiations with PUSD to summarize the project, potential construction <br />impacts, construction sequencing, and potential temporary construction easements at Alisal Elementary <br />School. Carollo will support the City in discussions with PUSD and provide technical information related to the <br />project for construction of facilities at both school sites. Carollo will incorporate requirements into the <br />design. <br />Task 9.6 – Permit to Abandon Wells 3, 4, 5 and 6 <br />LSCE will prepare the Zone 7 Water Agency permit applications for destruction of Wells 3, 4, 5 and 6. The <br />detailed scope of work for this task is included in Attachment E Task 9.6.