Laserfiche WebLink
<br /> NOVEMBER 2021 | 13 <br />Task 9.7 Construction Stormwater General Permit Applications and SWPPP <br />Carollo will assist City in preparing the permit application during design and prepare a stormwater pollution <br />plan to be included in the contract documents. <br />Task 9 Deliverables: <br />· DDW permit applications and supporting materials for CTF. <br />· Refer to Attachment E for permit deliverables related to new Well 9 and Well 10 and to abandon <br />Wells 3, 4, 5, and 6. <br />· BAAQMD permit application. <br />· PG&E service applications. <br />· SWRCB General Stormwater Permit Application and SWPPP. <br />Task 9 Assumptions: <br />· City will pay all permit fees. <br />· The necessary temporary construction easements to construct Well 10 will be determined during <br />final design. <br />· Refer to Attachment E for additional assumptions. <br />Optional Services <br />The follow tasks are optional services. Prior to performing services related to any of these tasks, Carollo will <br />receive written authorization from the City's Project Manager. <br />Optional Task 10.0 – Drinking Water State Revolving Fund (DWSRF) Funding <br />Assistance <br />This task includes assisting the City with the DWSRF application. Carollo will provide the final DWSRF <br />Application Packages to the City for upload to the SWRCB FAAST system. Carollo will support City staff <br />throughout the application process and address questions from the State to keep the DWSRF Package review <br />on track. <br />Task 10.1 – Prepare Technical Package for Construction Application <br />Carollo will work with City staff to obtain information required for the Technical Package. Carollo will prepare <br />the draft and final technical package by documenting key project information to meet application <br />requirements, coordinate technical package development with design effort, and maximize flexibility for <br />design changes. Technical package includes the engineering report, project plans/specifications, groundwater <br />source information, climate change response, and TMF form. <br />Task 10.2 – Prepare Environmental Package <br />Carollo will coordinate with ESA (refer to Attachment F, Task 10.2) to prepare the environmental application <br />package. Documentation provided in the environmental package includes: <br />· CEQA documentation (e.g., IS/MND, NOD, Notice of Completion).