Laserfiche WebLink
<br /> NOVEMBER 2021 | 11 <br />Task 7.6 – Prepare CEQA Mitigation Monitoring and Reporting Program (MMRP) <br />ESA will prepare an MMRP in accordance with CEQA requirements. The detailed scope of work for this task is <br />included in Attachment F Task 7.6. <br />Task 7.7 – Certification and Approval <br />The detailed scope of work for this task is included in Attachment F Task 7.7. <br />Task 7 Deliverables: <br />· Refer to Attachment F for deliverables. <br />Task 7 Assumptions: <br />· Refer to Attachment F for assumptions. <br />Task 8.0 – Bid Phase for Main Construction Contract <br />Task 8.1 – Attend Pre-Bid Meeting <br />This task includes attending and supporting the pre-bid meeting for the project construction. The pre-bid <br />meeting will be held at City facilities and will include a brief presentation and site walk. <br />Task 8.2 – Respond to Bidders Questions <br />This task includes responses to contractor questions during the bid period. <br />Task 8.3 – Prepare Addenda <br />Carollo will prepare addenda to the contract to respond to bidders’ questions. It is assumed Carollo will <br />prepare two addenda. <br />Task 8.4 – Conformed Documents <br />Carollo will prepare conformed documents for construction of the project. The conformed documents will <br />combine the bid documents and addenda into a single set. <br />Task 8 Deliverables: <br />· Carollo will prepare addenda. <br />· Carollo will provide an electronic copy (PDF) of conformed documents. <br />· Carollo will provide 10 full-sized hard copies of the drawings, 10 half‑sized sets of drawings, and 10 <br />sets of specifications. <br />Task 8 Assumptions: <br />· Carollo will prepare two addenda.