My WebLink
|
Help
|
About
|
Sign Out
12
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
120721
>
12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2021 4:15:11 PM
Creation date
12/1/2021 4:14:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/7/2021
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> NOVEMBER 2021 | 5 <br />requirements; the meeting discussion will be summarized in meeting minutes. Carollo will provide two to <br />three conceptual drawings and renderings for City review. <br />Siegfried will develop the landscaping design for Well 9 (consistent with Amador Community Park) and <br />provide visual screening for new facilities at the CTF. This task includes attending a pre-design coordination <br />meeting to discuss landscaping requirements, assisting in the development of renderings, and developing 50 <br />percent, 95 percent, 100 percent, and bid landscape design drawings and specifications. <br />Task 2.7.b – Building Department Permit Application <br />The Building Department permit review application will be submitted at 95 percent design for the new Well 9 <br />building, new Well 8 electrical building, CTF structure, and electrical service upgrades at all three well <br />facilities. Carollo will provide technical support for the permit and incorporate building department review <br />comments. <br />Task 2.7.c – Chemical Facility Design Coordination with Livermore-Pleasanton Fire Department <br />Carollo will attend two meetings with the Livermore-Pleasanton Fire Department at the 50 percent and <br />95 percent design submittals to review the OSC chemical facility design. Carollo will incorporate the Fire <br />Department’s review comments into the design. <br />Task 2.7.d – Municipal Regional Stormwater Permit <br />Carollo will prepare the Municipal Regional Stormwater Permit (MRP) C.3 and C.6 required packages for City <br />engineering department review and incorporate requirements into the final design. Carollo will also assist in <br />preparing maintenance plans. <br />Task 2.7.e – Constructability Review Coordination <br />The City will hire a third-party consultant to perform a constructability review of the 95 percent design. <br />Carollo will provide technical information, attend the constructability recommendations workshop led by the <br />third-party consultant, and incorporate comments into final design. <br />Task 2.8 – Hydraulic Surge Analysis <br />Carollo will perform a hydraulic surge analysis of project facilities during final design. The analysis will <br />consider each well site, the PFAS treatment system, and impacts to the City’s existing potable distribution <br />system. The surge analysis will consider the surge developed by power failure at each well pump, pump start, <br />valve closures, and PFAS treatment system operation that may cause a hydraulic transient surge condition. <br />The surge analysis will be summarized in a technical memorandum (TM) and will provide recommendations <br />for operation of the system, surge control facilities at each well site, opening/closing speed for the pump <br />control valve, and surge control facilities within the City’s distribution system (if necessary). <br />Task 2.9 – Corrosion Protection Evaluation and Design <br />JDH Corrosion (JDH) will lead the corrosion protection evaluation and final design task. The corrosion <br />protection evaluation and design scope of work is defined in Attachment A. <br />Task 2 Deliverables: <br />· Draft and final surge analysis TM.
The URL can be used to link to this page
Your browser does not support the video tag.