Laserfiche WebLink
16. <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />Service for all waste disposal. Only that portion of trash and recycling waste refused by <br />Pleasanton Garbage Service shall be disposed of or diverted by another trash/recycling <br />company. <br /> <br />No vehicles shall be parked in the driveway. All vehicles must be parked in the garages <br />and the uncovered parking space noted on the development plan or on the street in areas <br />designated for public parking. This restriction shall be disclosed to the future <br />homeowners in a manner satisfactory to the City Attorney. <br /> <br />Two parking spaces shall be maintained in the Lot A garage at all times and one parking <br />space shall be maintained in the Lot B garage at all times. The Lot A and B garages shall <br />not be used for storage in a manner that would interfere with the ability to park cars <br />within the garage. This restriction shall be disclosed to the future homeowners in a <br />manner satisfactory to the City Attorney. <br /> <br />No boats, campers, or trailers shall be parked or stored on Lot B. Boats, campers, or <br />trailers shall not be stored or parked in the Lot A garage or uncovered parking space, but <br />may be parked or stored in other locations on the site provided that they are adequately <br />screened from the street as required in Chapter 18.84 of the Municipal Code. <br /> <br />The height of the structures shall be surveyed and verified as being in conformance to the <br />approved building height as shown on Exhibit "A" or as otherwise conditioned. Said <br />verification is the project developer's responsibility, shall be performed by a licensed land <br />surveyor or civil engineer, and shall be completed and provided to the Planning <br />Department before the first framing or structural inspection by the Building Depat[ment. <br /> <br />The applicants shall submit a pad elevation certification prepared by a licensed land <br />surveyor or registered civil engineer to the Chief Building Official and Planning Director, <br />certifying that the pad elevations and building locations (setbacks) are pursuant to the <br />approved plans, prior to receiving a foundation inspection for the smacture. <br /> <br />This development shall be considered as a "first-come, first-served" project for growth <br />management purposes. <br /> <br />Wood-burning fireplaces shall be prohibited. Natural gas-fired fireplaces, EPA-certified <br />wood fireplaces or heaters, and wood pellet-fueled heaters and fireplace inserts shall be <br />allowed. <br /> <br />The project developer shall provide all buyers with copies of the project conditions of <br />approval. <br /> <br />PUD-28 Conditions of Approval Page 4 <br /> <br /> <br />