Laserfiche WebLink
10. <br /> <br />11. <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />facilities necessary to off-set this project's reasonably related effect on the long-term need <br />for expanded school facilities to serve new developmem in Pleasanton. The method and <br />manner for the provision of these funds and/or facilities shall be approved by the City and <br />in place prior to issuance of building permits. In no event shall construction commence <br />unless the above method and manner for the provision of these funds and/or facilities has <br />been approved by the City. <br /> <br />Prior to issuance of a building permit, the project developer shall pay the applicable Zone <br />7 and City connection fees and water meter cost for any water meters, including irrigation <br />meters. Additionally, the project developer shall pay any applicable Dublin San Ramon <br />Services District (DSRSD) sewer permit fee. <br /> <br />The developer shall pay the in-lieu park dedication fees in effect at the time building <br />permits are issued for the structures to be constructed. <br /> <br />This development plan shall be of no further validity and the project developer shall be <br />required to submit the same or new development plan for City approval prior to <br />development of the site in the event that the project developer fails to record a £mal parcel <br />map within two (2) years of PUD approval. <br /> <br />The project developer acknowledges that the City of Pleasanton does not guarantee the <br />availability of sufficient sewer capacity to serve this development by the approval of this <br />case, and that the project developer agrees and acknowledges that building permit <br />approval may be withheld if sewer capacity is found by the City not to be available. <br /> <br />This approval does not guarantee the availability of sufficient water to serve the project. <br />The City shall withhold building permits for the project if at the time building permits are <br />applied for, mandatory water rationing is in effect, unless the City has adopted a water <br />offset program and unless the project developer is participating in the program. <br />Notwithstanding the project developer's participation in such a program, the City may <br />withhold building permits if the City determines that sufficient water is not available at <br />the time of application of building permits. <br /> <br />The project developer shall submit a waste generation disposal and diversion plan to the <br />Building Department prior to issuance of building or demolition permits. The plan shall <br />include the estimated composition and quantities of waste to be generated and how the <br />project developer shall recycle at least fifty pement (50%) of the job site construction and <br />demolition waste. Proof of compliance shall be provided to the Chief Building Official <br />prior to the issuance of final occupancy. During demolition and construction, the project <br />developer shall mark all trash disposal bins "trash materials only" and ail recycling bins <br />"recycling materials only". The project developer shall contact Pleasanton Garbage <br /> <br />PUD-28 Conditions of Approval Page 3 <br /> <br /> <br />