Laserfiche WebLink
Revised Proposal for Geotechnical Pavement Investigation BSK Proposal GL21-21837B <br /> W. Las Positas Boulevard September 15, 2021 <br /> Pleasanton, California Page 6 <br /> investigation was conducted concurrently with the main investigation and/or the optional Task 6 above, <br /> some cost savings could be realized. <br /> OPTIONAL Task 8—Post-Report Consultation <br /> If necessary, after issuance of our report, we can provide consultation if the City requests additional <br /> geotechnical design input for the project. The budget for this optional task can also be used to issue a <br /> revised report if it becomes necessary or attend virtual or in-person project meetings. We suggested an <br /> initial budget for this task in our fee breakdown below. However,depending on the level of effort needed, <br /> our fee for this task may need to be revised accordingly. <br /> SCHEDULE <br /> BSK is ready to start working on this project immediately following receipt of formal authorization to <br /> proceed. Depending on subcontractor availability,we anticipate starting our field investigation within four <br /> to eight weeks after receipt of notice to proceed. We anticipate that the subsurface investigation can be <br /> completed in eight (8) working days. We estimate that laboratory testing will be completed within <br /> approximately four to five weeks following the completion of the subsurface investigation,and the report <br /> will be submitted within approximately four weeks after completion of the laboratory-testing program. <br /> FEE ARRANGEMENTS <br /> Fees for our services will be charged on a time and materials basis not to be exceeded without prior <br /> authorization. Our charges will be invoiced monthly. For the scope of services discussed herein, our fee <br /> estimate, approximately broken down by task,will be as listed in the table below. See attached Detailed <br /> Fee Estimate for more detailed breakdown including labor hours. <br />