Laserfiche WebLink
Site Evaluation EXHIBIT B <br /> Ranking Criteria 4TH HOUSING ELEMENT CYCLE (2007-2014) <br /> 6/3/11 SITE SELECTION CRITERIA <br /> :1=Yes;O=No <br /> Site <br /> I.Criteria for Initial Round of Evaluation <br /> 1. Infill <br /> a. Site is an infill site <br /> b. Site is not anticipated to require off-site sewer/water infrastructure <br /> improvements <br /> 2. Proximity to Modes of Transportation <br /> a. Site is within':mile of BART <br /> b. Site is within%mile of BART <br /> c. Site is within 1/3 mile of transit stop with 15 minute headway to BART <br /> d.Site is within 1/3 mile of transit stop with 30 minute headway <br /> e.Site is adjacent to bike route <br /> f.Site is within 1/2 mile of freeway on ramp <br /> 3. Proximity to Services and Amenities <br /> a. Site is within 1/2 mile of an existing or approved grocery store <br /> b. Site is within%mile of an existing elementary school <br /> c. Site is within%mile of an existing middle school <br /> d. Site is within 1/2 mile of an existing or planned park/open space <br /> 4. Impact on Future Residents <br /> a.Site is not anticipated to have odor impacts <br /> b. The project is anticipated to meet noise standards with no or with reasonable <br /> mitigation measures(if adjacent to or across the street from freeway or rail line= <br /> 0) <br /> c. The site is not within BAAQMD's air quality screening distance for new sensitive <br /> receptors <br /> d. The site is within the standard response time for emergency services <br /> e. The site is outside geological and fire hazard areas <br /> Site is not within Alquist Priolo zone or fault zone <br /> Site is not within earthquake induced landslide zone <br /> Site is not within Special Fire Protection Area <br /> f. The site is outside a 300-foot radius of an existing wireless facility <br /> g. The site will be at least 150 feet from overhead portions of the 230 kV line and <br /> at least 37.5 feet from underground portions of the 230 kV line <br /> 5. Height and Mass Compatibility <br /> a. Will the project(assuming 3 stories)be no more than one story higher than all <br /> adjacent residential development or all residential development across a <br /> residential collector or local street <br /> b. Will the FAR of the proposed project(assuming an FAR of 80%)be less than <br /> twice of the allowable FAR for development on all adjacent sites(not including <br /> parks)and sites across a residential collector or local street <br /> c.Site is not adjacent to or across(a residential collector or local street)from an <br /> existing single-family detached residential home(s) <br /> EXHIBIT B <br /> 4th Housing Element Cycle(2007-2014) <br /> Site Selection Criteria <br /> Page 1 <br />ia for 6th Cycle (2023-2031) Housing Element Update Sites <br />ion review and provide a recommendation on the draft <br /> sites selection criteria for the 6th Cycle Housing Element, including any modifications, additions <br /> or deletions to the draft criteria as presented in Exhibit A. <br /> PUBLIC NOTICE <br /> Notice of this item was published in The Valley Times. This item was also identified in the <br /> Pleasanton Weekly's "Agenda Highlights" for upcoming public meetings, and an email <br /> Additional analysis in topic areas as views and aesthetics will be completed as part of the CEQA review, and will <br /> be brought forward for consideration in future evaluation phases. <br /> Housing Element Update Planning Commission <br /> 7 of 8 <br /> they reflect both the general planning principle that residential uses should be convenient to <br /> schools, parks, and other amenities, and also respond to criteria in the TCAC program that <br /> Housing Element Update Planning Commission <br /> 5 of 8 <br /> discussion regarding massage businesses that arose during the Downtown Specific Plan <br /> (DSP) update, and concerns then about an overabundance of personal services. She <br /> Planning Commission Minutes Page 3 of 9 July 28, 2021 <br />