My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
081721
>
04 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:18:25 PM
Creation date
8/12/2021 4:02:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2021
DESTRUCT DATE
15Y
Document Relationships
04
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\081721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approved plans during construction which affect the digital submittal, shall be resubmitted <br />for GIS review no later than 1 month prior to scheduling a final inspection. The updated <br />digital submittal will be checked and approved before the building permit will be finalized <br />and certificate of occupancy granted (if applicable). For phased project, the digital <br />submittal must be approved prior to the first occupancy of any phase. The information will <br />be used for public safety and emergency response planning by the Police and Fire <br />Departments. Refer to the "Digital Plan Submittal Requirements" for necessary data and <br />file formatting requirements. <br />ENGINEERING DEPARTMENT — LAND DEVELOPMENT — 925-931-5650 <br />48. UTILITY UNDERGROUNDING: The applicant shall be responsible forthe undergrounding <br />of the overhead utility lines across the project frontage on Dublin Canyon Road All utility <br />lines shall be installed in conduit Only PG&E switch enclosures or capacity banks can be <br />installed above ground provided the units are screened with landscaping to the satisfaction <br />of the Director of Community Development. (Project Specific Condition) (Address this <br />condition prior to issuance of an Occupancy Permit.) <br />49. The applicant's design engineer shall submit the following documents with the first submittal <br />of the improvement plans: <br />a. Stormwater Requirement Checklist with an exhibit showing existing impervious <br />area, impervious area to be removed and replaced, and new impervious area to <br />be created; <br />b. Water demand calculations; <br />c. Sanitary sewer load calculations; and <br />d. Hydrologic and hydraulic calculations (Address these conditions prior to Building <br />Permit issuance.) (Project Specific Condition) <br />50. GROUNDWATER WELL: Because the applicant intends to utilize an existing groundwater <br />well for irrigation use, the applicant shall fill -out and submit to Zone 7 Water Agency a <br />"Statement of Future Well Use". Said form is available for download at the following link: <br />httr)://www.zone7water.com/imaaes/odf docs/permits/statement of future use.odf <br />(Address this condition prior to issuance of an Occupancy Permit.) <br />51. GEOTECHNICAL RECOMMENDATIONS: The Updated Geotechnical Investigation by <br />Geocon Consultants dated April 2020 (Project No. E9164-04-02) includes specific <br />recommendations with respect to the site improvements. All of these recommendations <br />shall be incorporated into the design. The following recommendations must be addressed <br />in the final design: <br />a. Recommendation 6.10.4 requires that retaining walls greater than 2 feet in retained <br />height be provided with a drainage system to prevent hydrostatic pressure buildup. <br />b. Recommendation 6.13.2 and .3 prohibits ponded water against any building <br />foundations. BMP -1 immediately adjacent to the northern and western walls of the <br />Community Center Building must have a barrier or liner shown on the bio -retention <br />area detail. (Address these conditions prior to Building Permit issuance.) (Project <br />Specific Condition) <br />
The URL can be used to link to this page
Your browser does not support the video tag.