My WebLink
|
Help
|
About
|
Sign Out
04 ATTACHMENT 1
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2021
>
081721
>
04 ATTACHMENT 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 4:18:25 PM
Creation date
8/12/2021 4:02:44 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/17/2021
DESTRUCT DATE
15Y
Document Relationships
04
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2021\081721
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These requirements shall be printed on the construction plans to the satisfaction of the <br />Director of Community Development. <br />33. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar vehicle <br />are not allowed on the construction site except when needed as sleeping quarters for a <br />security guard subject to receipt of a temporary conditional use permit (per PMC <br />18.116.010.E). <br />34. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on the <br />project site for daily administration/coordination purposes during the construction period. <br />35. CONSTRUCTION AND PARKING MANAGEMENT PLAN: In accordance with the Traffic <br />Control Plan, the applicant shall prepare a construction and parking management plan to <br />address impacts and parking demands during the construction phase of the project. The <br />construction and parking management plan shall be subject to review and approval by the <br />City Traffic Engineer and Director of Community Development prior to issuance of a <br />demolition permit, or the first building permit, whichever comes first. Separate construction <br />and parking management plans may be required for each phase of the project, depending <br />on timing of construction in each phase. The following items shall be incorporated into the <br />construction and parking management plan(s): <br />a. Show truck route for construction and delivery trucks that does not include <br />neighborhood residential streets, unless approved by the City Traffic Engineer; <br />b. Show construction vehicles and equipment parking area, materials storage, <br />temporary fencing, construction trailer location, and construction <br />contractors/workers parking area. <br />C. Sidewalk closure or narrowing is not allowed during on-site construction <br />activities without prior approval by the City. <br />36. PORTABLE TOILETS: Portable toilets used during construction shall be kept on the <br />project site and as far as possible from existing residences and shall be emptied to prevent <br />odor. <br />37. EXCESS SOIL AND SOIL STOCKPILING: All excess soil from the site shall be off -hauled <br />from the site and disposed of in a lawful manner. No temporary stockpiling of dirt on this <br />site shall occur without specific review and approval by the Director of Community <br />Development. If stockpiling is allowed, said stockpiles must be covered if rain is forecast. <br />38. NOTICE OF CONSTRUCTION: Prior to construction of any project phase, the applicant <br />shall notify neighbors within 300 -feet of the project site of the construction schedule in <br />writing. Such notice shall include contact names and numbers for property owner, agent <br />or contractor. If access to any bus stops operated by Livermore Amador Valley Transit <br />Authority is obstructed, then advance notice shall be sent to the Authority so drivers and <br />passengers can be alerted. <br />39. DISTURBANCE COORDINATOR: The applicant shall designate a "disturbance <br />coordinator" who shall be responsible for responding to any complaints regarding <br />construction noise, dust, construction parking, etc. The coordinator (who may be an <br />employee of the general contractor) shall determine the cause of the complaint and shall <br />require the implementation of reasonable measures warranted to correct the problem. A <br />telephone number of the disturbance coordinator shall be posted on the construction site <br />
The URL can be used to link to this page
Your browser does not support the video tag.