Laserfiche WebLink
Ordinance No. <br />Page 10 <br />Green Buildina and Sustainabilitv Measures <br />30. GREEN BUILDING — NON-RESIDENTIAL NEW CONSTRUCTION: Prior to building <br />permit issuance, a list of the green building measures used in the design, covered by this <br />approval, shall be provided to the Planning Division for review and approval by the Director <br />of Community Development. The project shall be designed, constructed and operated to <br />achieve a "certified rating," achieving at least the minimum points in each category, using <br />U.S. Green Building Council's "Leadership in Energy and Environmental Design (LEED)" <br />rating system. The green building measures shall be shown on the building permit plans <br />submitted to the Building and Safety Division. Each proposed point identified shall have a <br />notation indicating the sheet(s) the point can be found. A special inspection by the <br />Planning Division shall be coordinated with regards to exterior materials. Prior to building <br />permit final, all of the green building measures indicated on the approved checklist shall <br />be inspected and approved by either the City of Pleasanton, a third -party rater, or the <br />applicant shall provide written verification by the project engineer, architect, landscape <br />architect, or designer. (Per PMC 17.50) <br />Construction Practices and Noticing <br />31. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Friday. No construction shall be allowed on Saturdays, <br />State or Federal Holidays, or Sundays. The Director of Community Development may <br />allow earlier "start times" or later "stop times" for specific construction activities, e.g., <br />concrete pouring. All construction equipment shall meet Department of Motor Vehicles <br />(DMV) noise standards and shall be equipped with muffling devices. Prior to construction, <br />the hours of construction shall be posted on site. <br />32. CONSTRUCTION NOISE: The applicant shall implement the following construction best <br />management practices to reduce construction noise, including: <br />a. Locate stationary construction equipment as far from adjacent occupied <br />buildings as possible. <br />b. Select routes for movement of construction -related vehicles and equipment so <br />that noise -sensitive areas, including residences and outdoor recreation areas, <br />are avoided as much as possible. Include these routes in materials submitted <br />to the City of Pleasanton for approval prior to the issuance of building permits. <br />C. All site improvements and construction activities shall be limited to the hours <br />of 8:00 a.m. to 5:00 p.m., Monday through Friday. In addition, no construction <br />shall be allowed on State and federal holidays, Saturdays, or Sundays. The <br />Community Development Director may allow earlier "start times" for specific <br />construction activities (e.g., concrete foundation/floor pouring), if it can be <br />demonstrated to the satisfaction of the Community Development Director that <br />the construction and construction traffic noise will not affect nearby residents. <br />Prior to construction, the hours of construction shall be posted on site. <br />d. All construction equipment must meet DMV and City noise standards and shall <br />be equipped with muffling devices. <br />e. Construction activities conducted on the subject property shall not exceed 86 <br />dBA at any point outside of the property plane of the subject property <br />(Pleasanton Municipal Code Section 9.04.100.B.). <br />