PROJECT DESCRIPTION
<br /> The applicant proposes to construct and operate a 9,792-square-foot church and 24,971-
<br /> square-foot multi-purpose building in multiple phases on a 4.3-acre portion of the site. The
<br /> church building is proposed to include a sanctuary/nave with seating for up to 358 people as
<br /> well as a vaulted choir loft. The multi-purpose building would be two-stories and include
<br /> administration offices, religious education/study rooms, a commercial kitchen, and a
<br /> gymnasium. As part of the site improvements, the applicant is proposing to construct 121
<br /> parking spaces on the subject site.
<br /> The Project is proposed to be completed in phases. The first phase (Phase 1) will be to grade
<br /> the site and prepare the site for construction (utilities, pads, landscaping, hardscaping). The
<br /> second phase (Phase 2) will be the construction of the 9,792-square-foot church. Phase 1 and
<br /> 2 are anticipated to take between 2-5 years to complete. The third phase (Phase 3) is to be
<br /> completed in three subphases to construct the 24,971-square-foot multi-purpose building.
<br /> Phase 3 is anticipated to occur within 5-15 years, with the complete relocation of the church's
<br /> existing facility from its current location in Castro Valley within 15 years.
<br /> Site Plan and Access
<br /> The applicant is proposing to subdivide the roughly 16-acre parcel into two parcels (one parcel
<br /> for the existing church and one parcel for the new Greek Orthodox Church. Figure 2 shows the
<br /> proposed 4.3-acre portion of the site. The proposed new church parcel will extend from the top
<br /> of the southern bank of the creek, with the creek and remainder of the site remaining within the
<br /> existing church parcel. The new church site will be approximately 4.3-acres and will be
<br /> accessed from two driveways off Dublin Canyon Road, just west of Laurel Creek Drive. The
<br /> multi-purpose building will be setback approximately 25 feet from the property line along Dublin
<br /> Canyon Road; however, the two-story portion of the building will be stepped back considerably
<br /> further, at approximately 87-feet from the property line.
<br /> The multi-purpose building will also be setback 35 feet from the adjacent single-family property
<br /> line to the west, separated by a driveway, and 15-foot landscape buffer. The principal vehicle
<br /> access for church patrons and guests will be provided by the main central driveway; while the
<br /> far western driveway will primarily be used as a service entry for garbage pick-up, deliveries,
<br /> and emergency vehicle access.
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 5 of 15
<br />he Planning Commission support the proposed building and dome heights?
<br /> Commissioners requested additional information and justification from the applicant on the
<br /> building and dome heights but were generally supportive overall.
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 3 of 15
<br />17, a four-lot subdivision was approved by the City to subdivide the existing 16.2-acre site
<br /> into four lots in accordance with the PUD approval. A two-year extension of the map approval
<br /> was originally granted on April 26, 2019 with an additional one-year extension granted on April
<br /> 9, 2021; however the map has not been recorded.
<br /> The conditions of approval for PUD-114 stated the residential lots covered by the PUD
<br /> development plan would be subject to the permitted and conditional uses of the One-Family
<br /> Residential District, and the agriculturally zoned portion of the lot covered by the PUD
<br /> PUD-114-01M, 11300 Dublin Canyon Road Planning Commission
<br /> 2 of 15
<br />g calculations of the
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 16 of 25
<br /> PUD-114-01M& P20-0995 Planning Commission
<br /> Page 3 of 25
<br />YCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM
<br /> ;-----fk;s7,4G
<br /> il
<br /> 3`
<br /> • kst • .7
<br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,...
<br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/
<br /> \ ‘ 111-,-,: .
<br /> ,..... i ..., i
<br /> 1:11,343
<br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16
<br /> I i II May 10,2021 FLEA:.,ANTON.
<br /> 0 650 1,300 Feet
<br /> |