My WebLink
|
Help
|
About
|
Sign Out
5_Exhibits A & C
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
07-14
>
5_Exhibits A & C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 1:03:54 PM
Creation date
7/7/2021 1:03:18 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/14/2021
DESTRUCT DATE
15Y
Document Relationships
5
(Message)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\07-14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
LANDSCAPE ARCHITECTURE DIVISION — 925-931-5672 <br /> Landscaping <br /> 68. LANDSCAPING: Proposed landscaping shall be shown on the site plan and reviewed <br /> and approved by the City Landscape Architect prior to building permit issuance. <br /> Additional landscaping materials or modifications may be required by the Landscape <br /> Architecture Division at final inspection to ensure adequate planting coverage and/or <br /> screening. <br /> 69. WATER EFFICIENT LANDSCAPE ORDINANCE (WELD): The project shall comply with <br /> the City of Pleasanton's Water Efficient Landscape Ordinance (WELO) and Bay Friendly <br /> Basics Landscape Checklist. The applicant shall submit a Landscape Documentation <br /> Package in PDF format to the Landscape Architecture Division, which shall be subject to <br /> review and approval by the City Landscape Architect prior to building permit issuance. <br /> The Landscape Documentation Package shall include: <br /> a. Project Information; <br /> b. Water Efficient Landscape Worksheet; <br /> c. Soil management report; <br /> d. Landscape design plan; <br /> e. Irrigation design plan; and <br /> f. Grading design plan. <br /> 70. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final <br /> inspection by the Building and Safety Division, the applicant's landscape architect shall <br /> submit a Certificate of Completion Package in PDF format to the Landscape Architecture <br /> Division for review and approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling; <br /> d. Schedule of irrigation, landscape and irrigation maintenance; <br /> e. Landscape irrigation audit report; and <br /> f. Soil management report (if not previously submitted). <br /> 71. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br /> installed as shown on the approved building permit set and shall be inspected and <br /> approved by the Landscape Architecture Division. <br /> 72. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with <br /> wheel stops, if determined to be acceptable by the Director of Engineering/City Engineer <br /> and Director of Community Development, shall be installed between all paved and <br /> landscape areas, in conformance with the City's Standard Specifications and Details. <br /> 73. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br /> seed mixture designed by the applicant's landscape architect and approved by the <br /> Landscape Architecture Division prior to installation. The erosion control shall be <br /> maintained by the applicant until permanent landscaping is in place. <br /> P21-0076 & PUD-141 Planning Commission <br /> Page 12 of 16 <br />ll certify and note the <br /> recording data on the 18-inch X 26-inch mylar and return the original mylar to the <br /> Director of Engineering/City Engineer. <br /> FIRE DEPARTMENT — 925-454-2361 <br /> The Fire Prevention Bureau reviews building/civil drawings for conceptual on-site fire mains and <br /> fire hydrant locations only. Plan check comments and approval DO NOT include: 1.) Installation <br /> P21-0076 & PUD-141 Planning Commission <br /> Page 10 of 16 <br />AP REVIEW: The applicant shall submit a preliminary copy <br /> of the parcel map, approved tentative map, preliminary title report(s), adjoining deeds, <br /> P21-0076 & PUD-141 Planning Commission <br /> Page 9 of 16 <br /> Page 5 of 16 <br /><br /> , ..'itiovvittcl.,d--:_-_-:_--- ---.1, --,.,,c-v-,,t, ._,A g <br /> -,1 <br /> 1--J <br /> It WAYCROSSCRISFIELD .*- 4-; -,47÷-'' 1.1--1 ''.-. HAM <br /> ;-----fk;s7,4G <br /> il <br /> 3` <br /> • kst • .7 <br /> I DIJNIYA1:1%, ..4.. ,i4is' '1 , „J 10 ,,,... <br /> ‘1 'kTIAV - 1) \ ‘ ' ?) $.Y \t, ,2:2/ <br /> \ ‘ 111-,-,: . <br /> ,..... i ..., i <br /> 1:11,343 <br /> o 0.125 0.25 mi PUD-140, Townsend, Lot Line, 2207 Martin Ave Planning Division =-- -.• .-.... , 1:16 <br /> I i II May 10,2021 FLEA:.,ANTON. <br /> 0 650 1,300 Feet <br />