My WebLink
|
Help
|
About
|
Sign Out
RES 211231 Exhibit A
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2021
>
RES 211231 Exhibit A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 4:00:01 PM
Creation date
6/21/2021 3:40:58 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/15/2021
DESTRUCT DATE
PERMANENT
Document Relationships
RES 211231
(Attachment)
Path:
\CITY CLERK\RESOLUTIONS\2020-present\2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Checklist and City of Pleasanton–10x Genomics Project <br />Environmental Evaluation Initial Study/Mitigated Negative Declaration <br /> <br /> <br />66 FirstCarbon Solutions <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />road diesel-powered equipment. The proposed project would be required to comply with these <br />regulations, which are enforced by the ARB. Part 11, chapter 4 of the State’s Title 24 energy <br />efficiency standards establish mandatory measures for residential buildings, including material <br />conservation and efficiency. The proposed project would also be required to comply with these <br />mandatory measures. <br />The Energy Element of the Pleasanton General Plan contains a goal and several policies that aim to <br />reduce the City’s government and public electricity and natural gas consumption. Building and site <br />designs would be reviewed by the City of Pleasanton for energy impacts, prior to approval of the <br />proposed project. Therefore, it is anticipated that the construction phase of the proposed project <br />would not conflict with State or local renewable or energy efficiency objectives. Construction-related <br />energy impacts would be less than significant. <br />Operation <br />The proposed project would be designed and constructed in accordance with the City’s latest <br />adopted energy efficiency standards, which are based on the State’s Building Energy Efficiency <br />Standards. Energy conservation policies and standards have been established at the State, County, <br />and City level. The proposed project’s buildings would be designed and constructed in accordance <br />with the State’s mandatory Title 24 energy efficiency standards. These standards, widely regarded as <br />the most advanced energy efficiency standards, would help reduce the amount of energy required <br />for lighting, water heating, and heating and air conditioning in buildings and promote energy <br />conservation. These standards include minimum energy efficiency requirements related to building <br />envelope, mechanical systems (e.g., heating, ventilation, and air conditioning [HVAC] and water <br />heating systems), and indoor and outdoor lighting. The incorporation of the Title 24 standards into <br />the design of the proposed project would ensure that the proposed project would not result in the <br />use of energy in a wasteful manner. Additionally, the proposed project would need to comply with <br />policies in the City of Pleasanton General Plan pertaining to energy conservation.35 Consistent with <br />Policies 2, 4, 5, 7, 9, and 10, the proposed project would be required to implement parking lot tree <br />plantings, lighter colored paved areas, energy efficient lighting, and implement green building <br />standards. <br />The proposed project would have the option to be served with electricity provided by East Bay <br />Community Energy (EBCE) or PG&E. In 2018, PG&E obtained 39 percent of its electricity from <br />renewable energy sources (18 percent solar, 10 percent wind, 4 percent geothermal, 4 percent <br />biomass and biowaste, and 3 percent eligible hydroelectric), while the remaining electricity was <br />sourced from nuclear (34 percent), natural gas (16 percent), and large hydroelectric (13 percent).36 <br />PG&E also offers a 50 Percent Solar Choice option and a 100 Percent Solar Choice option. <br />Additionally, the future building occupant would have the option to opt-in to EBCE’s electricity <br />service program, which provides electricity from 100 percent renewable sources.37 Therefore, the <br />proposed project’s electricity provider meets the State’s current objective of 33 percent of electricity <br /> <br />35 City of Pleasanton. 2009. Pleasanton General Plan 2005-2025. Website: <br />https://www.cityofpleasantonca.gov/gov/depts/cd/planning/general.asp. Accessed February 16, 2021. <br />36 Pacific Gas and Electric (PG&E). 2019. 2018 Power Content Label: Pacific Gas and Electric Company. July. Website: <br />https://www.energy.ca.gov/sites/default/files/2020-01/2018_PCL_PG_and_E.pdf. Accessed November 20, 2020. <br />37 East Bay Community Energy. 2021. Power Mix. Website: https://ebce.org/our-power-mix/. Accessed February 16, 2021.
The URL can be used to link to this page
Your browser does not support the video tag.