Laserfiche WebLink
City of Pleasanton–10x Genomics Project Environmental Checklist and <br />Initial Study/Mitigated Negative Declaration Environmental Evaluation <br /> <br /> <br />FirstCarbon Solutions 67 <br />Https://adecinnovations.sharepoint.com/sites/PublicationsSite/Shared Documents/Publications/Client (PN-JN)/2148/21480024/ISMND/wp/21480024 10x Genomics Project Full Screencheck ISMND.docx <br />from renewable energy sources. Furthermore, the electricity provider which serves the proposed <br />project would be required to meet the future objective of 60 percent of electricity from renewable <br />energy sources by 2030. <br />The proposed project would comply with existing State energy standards and with energy conservation <br />policies contained in the Pleasanton General Plan. As such, the proposed project would not conflict <br />with State or local renewable or energy efficiency objectives. Impacts would be less than significant. <br />Mitigation Measures <br />No mitigation is required.