Laserfiche WebLink
• Construct a Class IV facility along the property frontage adjacent to Stoneridge Mall <br /> Road (north).4 <br /> • Construct a mixed-use path along the east side of the property. <br /> Phases 2/3 <br /> • Construct Traffic Signal at the intersection of Springdale Avenue and the Project <br /> Driveway. <br /> • Construct improvements at Stoneridge Drive and Springdale Avenue. <br /> o Extend eastbound left turn pocket to provide 200 feet of storage capacity. <br /> o Convert the existing southbound left/through combination lane to a left turn only <br /> lane. <br /> o Convert the existing southbound right turn lane to a through/right combination <br /> lane. <br /> o Modify northbound approach to allow simultaneous northbound and southbound <br /> left turns. <br /> In addition to the Level of Service analysis, a Vehicle Miles Travelled (VMT) <br /> assessment was performed, as required by 2013 Senate Bill 743 for inclusion in the <br /> CEQA Analysis. The results of the VMT analysis, which relies on a series of screening <br /> criteria that have been established by the Governors Office of Planning and Research, <br /> concluded the project would have a less-than-significant impact on VMT, based both on <br /> the characteristics of the project, estimated VMT per employee, and its location within a <br /> half-mile of the BART station and a high-quality bus transit corridor. <br /> Additional information on the methodology and quantitative basis for the traffic study's <br /> conclusions is provided in the Planning Commission agenda report (Attachment 6), and <br /> in the Mitigated Negative Declaration (Attachment 1A). <br /> Parking <br /> For Phase I, the applicant is proposing to repurpose and utilize 483 existing surface <br /> level parking spaces on the subject site. The proposed parking ratio is approximately <br /> one space per 313 gross sq. ft for Phase 1, equivalent to 3.3 spaces per 1 ,000 square <br /> feet; and would retain this ratio at buildout, if the proposed six-level parking garage and <br /> surface parking is constructed. <br /> Being a PUD, parking requirements are determined on a case-by-case basis. The <br /> proposed parking ratios for Phase I and buildout are slightly less than the PMC's office <br /> parking requirement (in non-PUD zones) of one space per 300 gross sq. ft. The <br /> proposed parking ratio reflects a relatively small reduction of 1.4 percent or 18 spaces, <br /> compared to the typical PMC parking requirement for office uses. However, it is <br /> reasonable to conclude this reduction would be offset by fewer employees choosing to <br /> As noted,the site plan shows a shared bicycle/pedestrian path to the north side of Building 1; it remains the City's <br /> preference to construct a Class IV cycle-track(on-street,two-way bicycle facility)along the project frontage. <br /> However,the City Traffic Engineer has determined the applicant's proposal would be an acceptable alternative <br /> (subject to approval of detailed design)if site conditions are determined to make construction of the cycle track <br /> infeasible. <br /> 21 <br />