Laserfiche WebLink
from 2019 traffic counts in this and subsequent analysis scenarios as this Workday <br /> building is now occupied but was not yet occupied at the time data was collected. <br /> • Scenario 2: Existing with Project — Existing volumes obtained from traffic counts and <br /> the existing roadway system configuration plus traffic estimated for the project. The <br /> roadway system is the same as Scenario 1 , except for changes proposed as part of <br /> the proposed project. <br /> • Scenario 3: Existing Plus Approved Projects (EPAP) No Project Conditions — <br /> Existing volumes plus traffic estimates for approved developments and/or traffic <br /> increases due to regional growth. This scenario reflects a future occupied fully <br /> functional retail development on the proposed project subject site consistent with the <br /> General Plan and as reflected in the City's travel demand model (164,000 square- <br /> feet of retail). This scenario also includes buildout of the Johnson Drive Economic <br /> Development Zone (JDEDZ) and associated roadway improvements on Stoneridge <br /> Drive, Stoneridge Mall Road, and Foothill Road. No additional roadway <br /> improvements were assumed. Redevelopment of a portion of the Stoneridge Mall is <br /> currently planned on the north side of Stoneridge Mall Road, which could change the <br /> configuration of drive aisles and access locations to Stoneridge Mall Road. <br /> • Scenario 4: EPAP Plus Proposed Project — Scenario 3 plus land use and roadway <br /> network changes proposed as part of the proposed project. <br /> • Scenario 5: Far-Term (Cumulative) No Proposed Project Conditions — Projected <br /> traffic volumes and the projected roadway system using the City of Pleasanton <br /> Travel Demand Model. The traffic forecasts include approved projects from Scenario <br /> 3, in addition to build out of land uses consistent with the General Plan and adopted <br /> Housing Element. This scenario also includes the assumption of a redeveloped site <br /> consistent with the General Plan and as reflected in the City's travel demand model <br /> (164,000 square feet of retail). <br /> • Scenario 6: Far-Term (Cumulative) Proposed Project Conditions — Traffic volumes <br /> from Scenario 5 plus changes from development of the proposed project. <br /> The traffic study concludes while the proposed project would not degrade any <br /> intersection beyond established levels of service standards (LOS D or better) operating <br /> at prior to the addition of proposed project traffic, the traffic study and staff are <br /> recommending conditions of approval/mitigation measures requiring the applicant to <br /> construct the following off-site improvements to ensure the local roadway network <br /> continues to operate at acceptable levels of service as prescribed by the General Plan: <br /> Phase 1 <br /> • Construct a westbound bike facility along the property frontage adjacent to <br /> Stoneridge Drive. <br /> 20 <br />