Laserfiche WebLink
revenue will be $14,100. The anticipated operational expenses this year will total <br /> $10,554, leaving $3,546 to be deposited into the fund reserve. <br /> As of May 1, 2021, the Moller Ranch GHAD has a fund reserve balance of $148,299. <br /> This reserve is for the repair of landslides, hillside slopes and drainage facilities, as may <br /> be necessary in the future, based on estimate of significant earth movement events <br /> discussed in the original Plan of Control for this GHAD. These reserves can also be <br /> used for the eventual replacement of infrastructure. Should a significant event occur, <br /> this reserve amount is likely inadequate to cover the cost of needed repairs. <br /> Lemoine Ranch Estates <br /> The Engineer's Report for the Lemoine Ranch Estates GHAD concludes that funding is <br /> needed for the following special services for properties within this GHAD in the coming <br /> year: repair hillside erosion, mitigate wildlife burrowing activity, clean debris from <br /> drainage ditches and inlets, remove stockpiled soil, inspect site, prepare the Engineer's <br /> Report, and manage City administrative costs. This year, staff recommends increasing <br /> the annual parcel assessment by two percent, to $735. With 12 properties within the <br /> GHAD, this year's projected revenue will be $10,220. The anticipated operational <br /> expenses this year will total $7,253, leaving $2,767 to be deposited into the fund <br /> reserve. <br /> As of May 1, 2021, the Lemoine Ranch Estates GHAD has a fund reserve balance of <br /> $108,561. This reserve is for the repair of landslides, hillside slopes and drainage <br /> facilities, as may be necessary in the future, based on estimates of significant earth <br /> movement events discussed in the original Plan of Control for this GHAD. These <br /> reserves can also be used for the eventual replacement of infrastructure. Should a <br /> significant event occur, this reserve amount is likely inadequate to cover the cost of <br /> needed repairs. <br /> Oak Tree Farm <br /> The Engineer's Report for the Oak Tree Farm GHAD has been prepared and concludes <br /> that funding is needed for the following ongoing special services for properties within <br /> this GHAD in the coming year: trim vegetation, clean debris from drainage ditches and <br /> inlets, repair gully at driveway, inspect site, prepare the Engineer's Report, and manage <br /> City administrative costs. This year, staff recommends increasing the annual parcel <br /> assessment by the allowed two percent to $335. With 42 properties within the GHAD, <br /> including the city-owned sanitary sewer pump station, this year's projected revenue will <br /> be $15,070. The anticipated operational expenses this year will total $11,672, leaving <br /> $3,398 to be deposited into the fund reserve. <br /> As of May 1, 2021, the Oak Tree Farm GHAD has a fund reserve of$121,724. This <br /> reserve is to be used to pay for landslide repair work, which the original Plan of Control <br /> estimated would be needed approximately every ten years. This reserve is slowly being <br /> replenished as over the last several years the majority of the reserve funds were used <br /> to complete erosion repairs along the fire trail within the covered area. Should a <br /> significant event occur, this reserve amount is likely inadequate to cover the cost of <br /> needed repairs. <br /> Page 4 of 5 <br />