Laserfiche WebLink
Figure 2: Master Plan Build-out Rendering <br /> -1 <br /> -s .44 <br /> ir <br /> falrfilr <br /> -.� ,� .e nide muting ,-ID deer- ,a � <br /> "Garhg and tacaoe materals m r __........' <br /> De cornplm entry i0 i0' to duping 1• •. •.wrte.' ID '" S` <br /> - � <br /> µ « � - <br /> . <br /> 41k. <br /> nit <br /> +1 ."--7-44 <br /> yam'.� r �1�. ".. <br /> �' • • :,.k«g y i a M p kl i s tar r 1f '�'T i'T gi 'x?. <br /> 4 t at VC p[ y tali 7 .—, <br /> 3,, '' 9 . , . 41. , 'Ali -. w,i' •. <br /> 1 y e may" <br /> .. +P' e fit.'-,` .".41.:"1"; <br /> r �yF 1`.�•r�•'��'!' 1..•/a`y, e� i ` 4 Y <br /> - p. _ 'et" jrP R o- <br /> N" y ftib*,„ .11 . <br /> 1 i `f yak f 4 W '•G - " '• g <br /> a :. F r'. x� fit -i .�. a• t 'DAN, <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 8 of 32 <br />See <br /> Exhibit B plan sheets L3.00 through L3.21 for more detail. <br /> Only Building 1 has its architecture developed in detail. Buildings 2/3 are much more <br /> conjectural/conceptual at this time; however, the expectation is later buildings would conform <br /> to the building area envelope established by the PUD Development Plan with architecture <br /> complementary to and compatible with Building 1. Given the conceptual nature of Buildings <br /> 2/3, development in later phases would be subject to separate design review and approval. <br /> Additional analysis of the proposed architecture and massing of buildings on site is provided in <br /> the Discussion section, below. <br /> Building 1 is a contemporary and uniquely designed structure featuring layered panel <br /> architecture which creates a rhythmic architectural pattern complemented by significant <br /> portions of glazing at the building entrances and on all four elevations. The building's massing <br /> incorporates significant wall plane movement, both horizontal and vertical architectural <br /> elements, changes to architectural element sizing and height (varies from 2-3 stories) and <br /> changes in material textures/colors throughout the various elevations. The third floor includes a <br /> recessed balcony oriented toward the middle of the campus. All rooftop equipment would be <br /> screened by a decorative metal screen. A service and delivery area, as well as a fully enclosed <br /> trash/recycling area, both of which are integrated architecturally into the building design, would <br /> be located at the south/southwest corner of the building. See Figures 6 through 12 below for <br /> the proposed elevations, renderings, and site/building sections, all of which provide full design <br /> details. Additionally, see Exhibit B Plan Sheets A5.05 and A6.01 through A6.05 for a detailed <br /> breakdown of all colors/materials proposed for Building 1. A color/materials board was made <br /> available to the Commission for review prior to the public hearing. <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 7 of 32 <br />e Traffic Study recommended a Class IV bicycle facility on the north side of the property. in the form of a two-way <br /> "cycle-track,"however,the applicant has indicated concerns about the feasibility of installing this facility due to the location <br /> of a utilities joint trench along a portion of this frontage,and thus proposed the shared path indicated on the plans. Although <br /> the Class IV facility is preferred by the City Traffic Engineer,the proposed facility could also be deemed an acceptable <br /> alternative. <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 6 of 32 <br />