My WebLink
|
Help
|
About
|
Sign Out
3
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
05-26
>
3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 11:39:36 AM
Creation date
5/19/2021 8:31:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/26/2021
DESTRUCT DATE
15Y
Document Relationships
3_Exhibit B - Plans
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit C
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx A
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx B
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx C
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx D
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx E
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx F
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx G
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx H
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx I
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx J
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx K
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D2
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibits A1-A3
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibits E-G
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 3: Height Comparison of Proposed Project and Surrounding Development <br /> Location Stories Height <br /> Proposed Building 1 3-stories 53 ft. at the parapet and 65 ft. at the top <br /> 1701 Springdale Avenue of the equipment screen <br /> Future Proposed Buildings 2/3 6-stories 67 ft. at the parapet and 82 ft. at the top <br /> 1701 Springdale Avenue of the equipment screen <br /> Workday office building 6-stories 87 ft. 6 in. at the parapet and 105 ft. at <br /> 6110 Stoneridge Mall Road the top of the equipment screen <br /> Stoneridge Corporate Plaza's 5-stories 65 ft. at the parapet and 80 ft. 5 in. at the <br /> 6140 Stoneridge Mall Road top of the equipment screen <br /> Pleasanton Corporate Commons 5-stories 70 ft. 3 in. at the parapet and 81 ft. 10 in. <br /> 6200-6230 Stoneridge Mall Road at the top of the equipment screen <br /> Safeway 5-stories 76 ft. at the parapet and 85 ft. 10 in. at <br /> 5928 Stoneridge Mall Road the top of the equipment screen <br /> BART parking garage 4-stories, 59 ft. 4 in. at the top of the elevator <br /> 6002 Stoneridge Mall Road 5-levels penthouse <br /> Sheraton Hotel 6-stories 60 ft. 1 in. <br /> 5990 Stoneridge Mall Road <br /> Despite the building being comparable in height to nearby office buildings, staff notes there are <br /> several lower-rise residential developments to the east and south of the project site, although <br /> the closest of these buildings are more than 175 feet from the property boundary. To maintain <br /> the architectural design quality for future proposed buildings 2/3 and the proposed parking <br /> structure, staff is recommending a condition of approval requiring these future structures to be <br /> designed to be architecturally complementary to/compatible with proposed Building 1. Staff is <br /> also recommending a condition of approval requiring subsequent Design Review applications <br /> be submitted for each future phase and be subject to Planning Commission consideration. A <br /> separate condition (COA No. 8) makes it clear that the setbacks specified are minimums, and <br /> the Planning Commission may, through subsequent design review, require modifications to <br /> ensure the buildings would be attractive, well-articulated, and be sensitively sited and designed <br /> to avoid over-concentrating building height and massing towards the project frontages. <br /> Scenic Highway Plan for Interstate 680 <br /> In 1985 the City adopted the "Scenic Highway Plan for Interstate 680 in the City of Pleasanton" <br /> which contains policies for new residential and commercial development on parcels <br /> immediately adjacent to the 1-680 corridor. The project was analyzed for conformance to the <br /> applicable policies and found to be consistent with the plan. For example, proposed Building 1 <br /> would be located at least 100 ft. from the 1-680 CalTrans right-of-way (approximately 1,200 ft. <br /> is proposed), the structure would not conflict with views from the highway due to existing <br /> screening provided by the adjacent office buildings, residential uses and landscaping would <br /> remain, and new perimeter landscaping associated with the proposed project. <br /> Grading and Drainage <br /> The subject site is relatively level, and the applicant is proposing to generally maintain the <br /> existing grades. Site drainage will be directed towards landscaped bio-retention planters <br /> located in various areas of the subject site for retention and treatment before draining into the <br /> City's storm drain system. As conditioned, staff finds the proposed grading and drainage plan <br /> to be acceptable and in compliance with applicable stormwater runoff requirements. <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 28 of 32 <br />, one on Stoneridge Mall Road (ring road) (Phase I), and <br /> one on Springdale Avenue (Phase I and primary)). <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 19 of 32 <br /><br />