Laserfiche WebLink
Phases 2/3 <br /> • Construct Traffic Signal at the intersection of Springdale Avenue and the Project Driveway. <br /> • Construct improvements at Stoneridge Drive and Springdale Avenue. <br /> o Extend eastbound left turn pocket to provide 200 feet of storage capacity. <br /> o Convert the existing southbound left/through combination lane to a left turn only <br /> lane. <br /> o Convert the existing southbound right turn lane to a through/right combination <br /> lane. <br /> o Modify northbound approach to allow simultaneous northbound and southbound <br /> left turns. <br /> Figure 13: Proposed Project Trip Distribution \\\ .,��, ��__,ffff <br /> I. <br /> in ' t all) \ ., <br /> ..) , Ild <br /> sits <br /> iag. 7jr ,....._____r_T_____ <br /> oth/31 le \ , • tmow . , 0 ,....„.... ,.:, NI ,,,,, a, +i <br /> lit t II \0 dk\ WAIII7 <br /> i 141 0 i _iiiik\illp - -.L. It\7.____ , ____________, <br /> NE <br /> A , ___ loll, ,, ,...........,_:„...____,t,-- <br /> .4x, <br /> w___ r.. <br /> __ <br /> J. <br /> '.. —_. b <br /> .4,- X4", \i+fi~ ". te. Of I, ( <br /> ai/ <br /> + f '•- V. 1,--- t' Nis <br /> ) I _ . <br /> .t." \, .. <br /> Y <br /> '''.\\ ' 9‘44fir———-IL\.,\*-1- —— ---,-21-!-11- = 1 1 O. 1 <br /> . ._,..„.-- iN <br /> t lite4&. , . , , <br /> - , lioi <br /> , ti <br /> _, <br /> 4 3:11M. % '',,'t6;k' <br /> / 101 Air -iiiii, ,„,,,,,, Vittr <br /> � Y <br /> • IOW --- * <br /> • <br /> PI_ --- '1,'',,11.4 ' r r� , <br /> ____ _ ,..lit., <br /> \ ,r. <br /> Wow IV s 1 (\.9 ./ L-i ' t <br /> ..0 ,site ® Pt Trp Disentut n <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 23 of 32 <br />h the City's General Plan policies, level of <br /> service and queuing assessments were undertaken. While the proposed project would not <br /> degrade any intersection beyond established levels of service standards (LOS D or better) <br /> operating at prior to the addition of proposed project traffic, the traffic study and staff are <br /> recommending conditions of approval/mitigation measures requiring the applicant to construct <br /> the following off-site improvements to ensure the local roadway network continues to operate <br /> at acceptable levels of service as prescribed by the General Plan: <br /> Phase 1 <br /> • Construct a westbound bike facility along the property frontage adjacent to Stoneridge <br /> Drive. <br /> • Construct a Class IV facility along the property frontage adjacent to Stoneridge Mall Road <br /> (north).4 <br /> • Construct a mixed-use path along the east side of the property. <br /> i As noted,the site plan shows a shared bicycle/pedestrian path to the north side of Building I; it remains the City's <br /> preference to construct a Class IV cycle-track(on-street, two-way bicycle facility)along the project frontage. However,the <br /> City Traffic Engineer has determined the applicant's proposal would be an acceptable alternative(subject to approval of <br /> detailed design)if site conditions are determined to make construction of the cycle track infeasible. <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 22 of 32 <br />20 of 32 <br /> Traffic and Circulation <br /> Vehicular access to the subject site would be provided from three existing driveways (one on <br /> Stoneridge Mall Road (Phases 2/3), one on Stoneridge Mall Road (ring road) (Phase I), and <br /> one on Springdale Avenue (Phase I and primary)). <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 19 of 32 <br /><br />