My WebLink
|
Help
|
About
|
Sign Out
3
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
AGENDA PACKETS
>
2020 - PRESENT
>
2021
>
05-26
>
3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2021 11:39:36 AM
Creation date
5/19/2021 8:31:12 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
5/26/2021
DESTRUCT DATE
15Y
Document Relationships
3_Exhibit B - Plans
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit C
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx A
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx B
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx C
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx D
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx E
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx F
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx G
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx H
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx I
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx J
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D1 - Appx K
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibit D2
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibits A1-A3
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
3_Exhibits E-G
(Attachment)
Path:
\BOARDS AND COMMISSIONS\PLANNING\AGENDA PACKETS\2020 - PRESENT\2021\05-26
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
While Phases 2/3 are conceptual, the applicant is proposing a 32-foot-wide minimum setback <br /> line meaning the future buildings constructed in these phases may be shifted anywhere within <br /> that minimum setback line as the applicant refines subsequent phases of their master plan <br /> While the applicant is proposing a minimum 32-foot-wide setback for all frontages, Building 1 is <br /> actually proposed to be set back approximately 80 to 90 feet from both Stoneridge Mall Road <br /> frontages, with a generously landscaped area on the edges of the property. Staff believes this <br /> setback to be acceptable and supportable based on the applicant's shade and shadow study <br /> as well as neighborhood context renderings. At the work session, the Commission expressed <br /> some concerns related to the proposed 32-foot-wide minimum setback and requested more <br /> information to illustrate how the proposed building heights and the minimum setbacks for all <br /> phases would affect surrounding development. The closest residential buildings to the east are <br /> located approximately 175 to 200 feet from the property line; and those to the south <br /> approximately 175 feet; minimally, future buildings would be set back an additional 32 feet <br /> from the property line. Figure 12, above, provides cross-sections illustrating the relationship <br /> between the proposed project and adjacent development, based on the conceptual building <br /> placements shown in the site plan. <br /> Like Phase I, some drop-off/pick-up trips would occur off Stoneridge Mall Road across from the <br /> residential uses to the east; however, the majority of vehicular trips to/from the subject site <br /> would still be directed off Springdale Avenue reducing impacts on the residential uses. It is <br /> further noted the applicant provided a shade and shadow study as part of the CEQA evaluation <br /> (Exhibit B) that modeled the conceptual Phase 2/3 buildings; that analysis concluded that the <br /> taller buildings in Phases 2/3 would minimally cast a shadow over the westernmost units of the <br /> existing residential uses to the east, only during the winter months, and only during the late <br /> afternoon from approximately 4 p.m. until dark, a less than significant impact. <br /> Based on the shade and shadow study and the renderings provided, it appears that both <br /> Building 1 and the future buildings in Phases 2/3 would have minimal effect on the surrounding <br /> development. Phases 2/3 would also be subject to a subsequent design review by the <br /> Planning Commission, which would allow for an opportunity to review more detailed and <br /> refined architecture and massing and make adjustments if needed. Condition of Approval Nos. <br /> 7 and 8 specify the required Planning Commission design review, including that the City would <br /> have the ability to require a larger setback for all, or portions of, the Phase 2/3 buildings, to the <br /> extent necessary to maintain visual compatibility with the surrounding area, avoid overly <br /> concentrating building height and mass towards the eastern frontage, and to provide for varied <br /> building massing and articulation along the project frontages, in a manner similar to that <br /> achieved for Building 1. Staff believes this approach provides the applicant adequate flexibility <br /> to design and place buildings within the proposed building envelope as they refine subsequent <br /> phases of their master plan in Phases 2/3, but also adequately protects surrounding <br /> development. <br /> Traffic and Circulation <br /> Vehicular access to the subject site would be provided from three existing driveways (one on <br /> Stoneridge Mall Road (Phases 2/3), one on Stoneridge Mall Road (ring road) (Phase I), and <br /> one on Springdale Avenue (Phase I and primary)). <br /> PUD-139 and P20-0973, 10x Genomics, Inc. Planning Commission <br /> 19 of 32 <br /><br />