Laserfiche WebLink
April 2021 DRAFT: FY2021/22 - FY 2022/23 City Council Work Plan <br />Staff Priority: A - Completed/milestone 1st year, B - Completed/milestone 2nd year <br />C - Completed/milestone as resources available, D - Not recommended Page# 15 of 24 <br />Goals Project Description City Dpmnt.CIP?CIP Estimate <br />Staff <br />Priority Project Status Detailed Project Status <br />Mayor <br />Brown VA JB KN JT <br />Design Undergrounding of Bernal <br />Avenue ditch <br />Design piping to convey storm water from the fairgrounds <br />along the south side of Bernal Avenue between the Alameda <br />County Fairgrounds and Bernal Park to minimize erosion of <br />the sides of the ditch along Bernal, which at this time is <br />beginning to encroach into and undermine the <br />bike/pedestrian path that runs alongside the ditch. <br />ENG Yes D <br />Planned Undergrounding this culvert is necessary to implement <br />the Bernal Property Specific Plan future park designs. <br />No work has occurred on this project. <br />Master Plan an Inclusionary/All Access <br />Playground <br />Master Plan an all ADA access and all abilities play structure <br />to foster more connections for community members of all <br />ages. <br />ENG/OSD/ <br />LR Yes Design Only A <br />Underway City Council approved agreement with RRM to conduct <br />community outreach and prepare a master plan. Start- <br />Up meeting with RRM occurred March 2, 2021. Library <br />and Recreation staff are coordinating the stakeholder <br />meetings with the various stakeholder groups (PUSD, <br />Parks and Recreation Commission, Sunflower Hill, <br />Rotary Clubs, etc.). The first meeting will be with the <br />Parks and Recreation Commission, and is scheduled for <br />April 8 to update the commission on the work plan and <br />next steps. <br />X X X X X <br />Add a Culture Art Walk Determine whether the Civic Center and Library Master Plan <br />should be amended to incorporate a Cultural Art Walk in the <br />proposed circular meadow area adjacent to the proposed <br />Library and Community Center location.ENG/OSD/ <br />LR Yes C <br />Delayed Paused due to COVID-19 <br />Civic Arts Commission Priority #2 <br />The Civic Arts Committee would like to add that it <br />would like to prioritize this project even if the Civic <br />Center Master Plan does not go through <br />X <br />Add new Lighted Sand Volleyball <br />Courts <br />Initiate review by the Parks and Recreation Commission to <br />determine whether the Parks and Recreation Master Plan <br />should be amended to add and prioritize new lighted sand <br />volleyball courts and to identify suitable location.ENG/OSD/ <br />LR Yes B <br />Delayed Discussion with Parks and Recreation Commission <br />resulted in the Commission wanting to complete a full <br />update of the Parks and Recreation Master Plan. <br />Request for funds for this project will be included in two- <br />year budget cycle for 2021-2023. <br />X X <br />Design the Renovation and Expansion <br />the Skate Park at Ken Mercer Sport <br />Park <br />Initiate review by the Parks and Recreation Commission to <br />Master Plan a new skate park or expand the current skate <br />park in the Ken Mercer Sports Park, as outlined in the Parks <br />and Recreation Master Plan.ENG/OSD/ <br />LR Yes A <br />Underway City Council has approved the agreement with RRM to <br />conduct community outreach and design the skate park <br />expansion. Start-Up meeting will be scheduled as soon <br />as the agreement is fully executed between City and <br />RRM. Public outreach is likely to begin end of April or <br />early May 2021. <br />X X X X X <br /> Cricket Pitches/Fields Determine a location and construct cricket pitches and <br />practice cages for the growing sport of cricket.LR/ENG C <br />New NEW <br />Parks & Recreation Commission Priority #3 X X X X X <br />Replace Library Roof and Lighting <br />System <br />The library roof and lighting system are both past their useful <br />lives. The roof needs to be replaced due to age and <br />condition. The current lighting system is no longer supported <br />by the manufacturer. <br />ENG A <br />New NEW <br />Library Commission Priority #2 <br />X X X X X <br />Quality of Life (continued) <br />Protect and enhance Pleasanton's quality of life <br />New Amenities