Laserfiche WebLink
EXHIBIT A <br /> Task 2. Engineering Services During Construction (ESDC) <br /> Task 2.1. Construction Meetings <br /> TJCAA personnel will attend the pre-construction meeting and subsequent periodic <br /> construction meetings. For budgeting purposes, the TJCAA team has assumed <br /> attendance at up to four (4) additional periodic construction meetings and up to <br /> three (3) discipline specific or as-needed observational field visits upon request <br /> from the City. <br /> Task 2.2. Requests for Information <br /> TJCAA personnel will provide written answers to Requests for Information (RFIs) <br /> including sketches and/or drawing revisions as appropriate. For budgeting <br /> purposes, TJCAA has included ten (10) RFIs associated with the design elements <br /> within its Scope of Work. <br /> Task 2.3. Contract Document Clarifications (CDCs) <br /> TJCAA personnel will provide written answers to CDCs including sketches and/or <br /> drawing revisions as appropriate. For budgeting purposes, TJCAA has included two <br /> (2) CDCs associated with the design elements within its Scope of Work. <br /> Task 2.4. Submittals <br /> TJCAA personnel will review shop drawings and catalog data and other materials <br /> that the contractor is required to submit in accordance with Contract Documents. <br /> For budgeting purposes, TJCAA has included twenty (20) discipline-specific <br /> Submittals, with a 35% resubmission rate, within its Scope of Work. <br /> Task 2.5. Construction Change Orders <br /> TJCAA personnel will provide written answers to Construction Change Orders, <br /> including sketches and/or drawing revisions as appropriate. For budgeting <br /> purposes, TJCAA has included one (1) Change Order associated with the design <br /> elements within its Scope of Work. <br /> Task 3. Record Drawings and Project Close-Out <br /> At the completion of the construction phase, TJCAA will incorporate mark-ups <br /> provided by the City into the design drawings to reflect changes made in the field. <br /> It is anticipated that one set of clear mark-ups will be provided by the City and all <br /> necessary information for the development of Record Drawings will be included in <br /> said mark-ups. <br /> II. Assumptions <br /> The scope of work detailed above is based on TJCAA's current understanding of <br /> the project requirements and is based on the following assumptions. <br /> 1. General <br /> • Copies of the final, issued set of Project Bid Documents (plans and <br /> specifications) will be provided to TJCAA for reference. <br /> • Assistance with obtaining City or County permits will not be <br /> required. <br /> HTTPS://T]CAA.SHAREPOINT.COM/SITES/PRO]ECTFILES/SHARED DOCUMENTS/2019/119075-COP,ICE ON-CALL SERVICES/119075A,LS 7 AND 8 <br /> VENTILATION AND LTG/2.0/119075,BID ESDC PROPOSAL.T]CAA.REV.DOCX <br /> 01/12/21 <br /> Page 2 of 4 <br />