Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
EXHIBIT B / SIGN <br /> ESTIMATED ENGINEERING HOURS AND COSTS C Ca Avow, <br /> City of Pleasanton Engirteurs_ Vorrkmq Weirder:Veil,Were; <br /> Foothill and Sycamore Reservoir Residual Control System <br /> Engineering Services During Construction <br /> CAROLLO COST SUMMARY <br /> Subtotals <br /> TASK PIC PM PE Struct Al' WO Senior CAD Word € Sub-Consultant <br /> Processor Misc.Cab <br /> Tech ,�AO Tech TT <br /> _ yy Markll -, .(iE <br /> Rates $315 $293 5230 5230 $188 821211614, 5198 yj142 5726 9126 S "et 21Land Pilaw Travel Total ODCa Total Cost <br /> Task 1-Project Management ' <br /> 1.1 Protect Adminlc0abon 2 l0 0 1 0 0 0 0 0 32 i 0 50 $ 9,318 5 5 - 5 650 0 - b b On, b - <br /> Task 1 Total Hours 2 16 0 --0 0 32 0 50 <br /> Task 1 Total Budget $ 830 $ 4,688 8 - $ - $ - $ - $ - $ 4,000 $ - $ 9,318 $ - $ - $ 650 8 - 8 - 8 850 $ 9,968 <br /> Task 2-Old Phase <br /> 2 1 Assist with Bidder Questions(assumes budget - - - - <br /> mellocebon of$123641 0 0 0 0 0 0 0 0 0 0 0 E $ $ $ $ $ 5 $ <br /> Tack 2 Total Hours 0 0 0 0 0 0 0 0 0 0 0 <br /> Task 2 Total Budget $ - $ - 8 - $ - 8 - 8 - $ - $ - $ - 8 - 8 - $ - $ - $ - $ - $ - $ - $ - <br /> Task 3-Engineering Services During Conduction <br /> 31 Abend Construction Meetings 0 2 18 0 18 0 0 38 8,110 $ - $ - $ 494 $ - $ 218 $ 712 $ 8,822 <br /> 3.2 RFI Review 0 4 20 8 40 0 0 72 15,132 $ 4,460 $ 446 $ 938 $ - $ - $ 5,842 S 20,974 <br /> 3.3 Submittal Renew 0 4 20 8 t00 0 24 156 29,397 $ 4,460 $ 446 $ 2,026 $ - $ - S 8,932 $ 36,329 <br /> 34 Develop Record Drawings 0 4 0 0 16 40 0 60 9,680 $ - $ - $ 760 $ 1,000 $ - $ 1,780 $ 11,840 <br /> 3.5 Operational Guide or RCS 4 8 0 0 0 0 0 8 60 18,324 $ - $ - S 780 $ - $ - $ 760 $ 17,104 <br /> 3.6 Electrical Inspection Oversite 0 0 0 0 0 0 0 0 - $ 4,460 8 448 $ - $ - S - $ 4,906 $ 4,908 <br /> Task 3 Total Hours 4 22 58 16 174 0 40 0 32 -2-6t- <br /> Task 3 Total Budget E 1,260 0 6,446 8 13,340 $ 3,660 $ 32,712 $ 11,720 $ - $ 5,680 8 - $ 3,966 76,623 $ 13,360 $ 1,338 8 8,016 $ 1,000 8 218 $ 20,052 8 90,778 <br /> ,11.881 <br /> PIC•Principal In Charge <br /> PM•Project Manage, <br /> PE•Project Engineer <br /> Struct•Structural Engineer <br /> AP•Ammtant Proleseienel <br /> ••Water Quality <br /> Admn•A4mnatrative <br />