Laserfiche WebLink
Exhibit C <br /> F1) PEZZON I <br /> ENGINEERING, INC. <br /> CONSULTING ELECTRICAL ENGINEERS <br /> January 11, 2021 <br /> Mr. Darren Baune, PE <br /> Carollo Engineers <br /> 2700 Ygnacio Valley Road, Suite 300 <br /> Walnut Creek, CA 94598 <br /> Project: City of Pleasanton Sycamore and Foothill Tank <br /> Residual Control System Design Project <br /> AS-01: Bidding and Construction Administration <br /> Dear Mr. Baune: <br /> Thank you for the opportunity to provide this proposal. The scope of proposed services is <br /> as follows: <br /> Provide additional engineering services for construction support activities per the attached <br /> provided scope of work which will include: <br /> • Review and responses to electrical RFI; 10 manhours <br /> • Review of Change Order Proposals; 4 manhours <br /> • Shop drawings and submittal review; 6 manhours <br /> • Record Drawings; 4 manhours CAD <br /> • Attend construction meetings; 10 manhours <br /> • Provide project closeout services related to punchlist creation; 8 manhours <br /> • Onsite Electrical Inspection Services (4 trips; 6 hours per trip) <br /> Total anticipated hours required for the above scope of work as described: <br /> Principal Engineer 62 hrs @ $210.00/hr <br /> CAD 4 hrs @ $90.00/hr <br /> All work to be billed per the original agreement Fee Schedule on a monthly basis. Our fee <br /> to complete the above scope will not exceed $13,380. <br /> 1150 9th Street,Suite 1415 <br /> Modesto,CA 95354 <br /> (209)554-4602 <br /> http://www.pezengr.com <br />