Laserfiche WebLink
1. RFI responses. <br /> 2. Submittal review comments. <br /> 3. Record drawings in CAD and PDF formats. <br /> 4. Draft and Final technical memorandum to summarize recommended operational strategies for the <br /> RCS units at the Sycamore and Foothill Tank sites. <br /> 5. This scope includes 5 half sized sets of the record drawings and specifications. <br /> Task 3.0-Assumptions <br /> 1. The active construction duration is four(4)months. <br /> 2. Carollo will review 10 RFIs.We have assumed 6 hours per RFI review. <br /> 3. Carollo will review(fifteen)10 initial submittals and five(5)resubmittals.We have assumed 8 hours <br /> for the initial submittal review and 4 hours for each resubmittal review. <br /> 4. Pezzoni will provide 4 electrical inspection oversite visits(assumes 6 hours per trip). <br /> 5. Refer to Exhibit C for Carollo's sub-consultant's(Pezzoni)assumptions for RFIs,change order <br /> proposals,submittal reviews, record drawings,construction meeting attendance, project closeout, <br /> and onsite electrical inspection services. <br /> 3 <br />