Laserfiche WebLink
Pleasanton All-Abilities Playground <br /> r r m Scope of Services <br /> January 15, 2021 <br /> 11111 design Page 7 of 9 <br /> group <br /> The following services or tasks are specifically excluded from the scope: <br /> • Construction documents. <br /> • Boundary survey for properties. <br /> • Environmental (CEQA) Processing. <br /> • State and Federal Agency processing and permits. <br /> • Permit fees and applications. <br /> • English language translation. <br /> • Lighting photometric plans. <br /> • Utility coordination for new electrical meter service. <br /> • Geotechnical Engineering. <br /> • Title 24 Lighting Energy Documentation Forms <br /> • Stormwater Pollution Prevention Plan/ QSP Services <br /> • Structural Calculations for retaining walls or landscape features <br />