Laserfiche WebLink
Pleasanton All-Abilities Playground <br /> r r m Scope of Services <br /> January 15, 2021 <br /> " <br /> //' design Page 4 of 9 <br /> I group <br /> a combination of hand drawings, written descriptions, and/or photographic character examples. <br /> RRM will assist the City in selecting appropriate manufacturer(s) based on the design goals and <br /> objectives and will develop the design of those elements in the next phase of the design (not a <br /> part of this scope). As part of this task, we will prepare two (2) 3D rendering views to illustrate <br /> the concept alternatives for presentation to staff and the public. <br /> Deliverables: <br /> • Two (2) draft black and white conceptual plan alternatives <br /> • Two (2) color conceptual plan alternatives which incorporate staff comments <br /> • Two (2) 3D rendering views of conceptual plan alternatives <br /> Subtask C.2: Final Conceptual Plan <br /> Based on feedback from our Childhood Development Sub Consultant, Staff and the community, <br /> we will combine preferred elements from both plan alternatives to create one conceptual plan. <br /> Design graphics will include an updated color illustrative plan. We will also prepare one (I) 3D <br /> rendering view of the preferred conceptual plan for presentation to staff and the public. <br /> Deliverables: <br /> • One (I) draft black and white conceptual plan <br /> • One (I) color final conceptual plan which incorporates staff comments <br /> • One (I) 3D rendering view of final conceptual plan <br /> Subtask C.3: Cost Estimate <br /> RRM will create a detailed planning level construction cost estimate for all project <br /> improvements and maintenance of the final conceptual plan based on recent construction and <br /> bid data. We will rely on information from City staff for the maintenance cost. <br /> Deliverables: <br /> • One (I) planning level cost estimate for the final conceptual plan <br /> Subtask C.4: Master Plan Outline Summary <br /> RRM will work with City staff and our Childhood Development Subconsultant to create an <br /> outline for the master plan summary including the following topics: <br />