My WebLink
|
Help
|
About
|
Sign Out
RES201194
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2020
>
RES201194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:38:47 PM
Creation date
12/23/2020 3:38:42 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/15/2020
DESTRUCT DATE
PERMANENT
NOTES
SELF-STORAGE FACILITY (PUBLIC STORAGE) 3716 STANLEY BLVD APPLICATIONS P19-0128, P19-0129
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton's Water Efficient Landscape Ordinance (WELO) and Bay Friendly Basics <br /> Landscape Checklist. The applicant shall submit a Landscape Documentation Package in PDF <br /> format to the Landscape Architecture Division. which shall be subject to review and approval by <br /> the City Landscape Architect prior to building permit issuance. The Landscape Documentation <br /> Package shall include: <br /> a. Project Information: <br /> b. Water Efficient Landscape Worksheet: <br /> c. Soil management report; <br /> d. Landscape design plan: <br /> e. Irrigation design plan; and <br /> f. Grading design plan. <br /> 85. CERTIFICATE OF COMPLETION: Upon completion of construction and prior to final inspection <br /> by the Building and Safety Division. the applicant's landscape architect shall submit a Certificate <br /> of Completion Package in PDF format to the Landscape Architecture Division for review and <br /> approval. The Certificate of Completion Package shall include: <br /> a. Project information sheet; <br /> b. Certificate of installation according to the landscape documentation package; <br /> c. Irrigation scheduling: <br /> d. Schedule of irrigation, landscape and irrigation maintenance: <br /> e. Landscape irrigation audit report: and <br /> f. Soil management report (if not previously submitted). <br /> 86. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be installed <br /> as shown on the approved building permit set and shall be inspected and approved by the <br /> Landscape Architecture Division. <br /> 87. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro seed <br /> mixture designed by the applicant's landscape architect and approved by the Landscape <br /> Architecture Division prior to installation. The erosion control shall be maintained by the <br /> applicant until permanent landscaping is in place. <br /> 88. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices. above <br /> ground irrigation controls. and above ground irrigation meters shall be located and screened to <br /> minimize their visual impacts. These devices with their proposed screening shall be shown on <br /> the landscaping and utility plans submitted with the building permit plans or improvement plans. <br /> clearly marked "above ground" or `below ground" on the plans, and shall be subject to the <br /> review and approval of the City Landscape Architect prior to their installation. If above-ground, <br /> they shall be painted forest green or an equivalent dark-green color. Screens shall consist of <br /> berms. walls. or landscaping satisfactorily integrated into the landscape plan. Landscape <br /> screens shall include shrubbery designed by species and planting density to establish a <br /> complete screen within 1 year from the date of planting. Weather protection devices. such as <br /> measures to protect pipes from freezing, shall require approval by the City Landscape Architect <br /> prior to use: at no time shall fabric or other material not designed and/or intended for this <br /> purpose be wrapped around or otherwise placed on these devices. <br /> 89. MAINTENANCE: The applicant and all future owners of the property shall. at no expense to the <br /> City, maintain all the landscaped areas related to the project in a healthful, attractive and <br /> reasonably weed-free manner consistent with the approved landscape plan. for the duration of <br /> the existence of the project. <br /> P19-0128/P19-0129 City Council <br /> Page 14 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.