Laserfiche WebLink
modeling reveals that the pipe is undersized, the applicant can either enlarge the pipe or <br /> can detain the storm water on-site in some manner until the downstream pipe network <br /> evacuates after the weather event passes. <br /> b. AND/OR: Elevate the finish floor elevations of the proposed buildings. This may require <br /> minor modifications to the site improvements or height/location of the new one-story storage <br /> building. Such modifications, if needed, are to be reviewed and approved by the Community <br /> Development Director. <br /> Note that Arroyo Del Valle creek, as currently configured, has adequate capacity to convey storm water <br /> away from the properties in the geographic area including and surrounding this property. (Address this <br /> condition prior to permit issuance). Project Specific Condition. <br /> Construction <br /> 54. GEOTECHNICAL CONSULTANT—CERTIFICATION OF CONSTRUCTION OF COMMERICAL <br /> PROJECTS: The applicant's California licensed geotechnical engineer shall inspect and approve <br /> the construction of all foundations, retaining walls, drainage and geotechnical aspects of the <br /> development to ensure compliance with the approved grading and improvement plans. The <br /> geotechnical engineer shall be present on site during grading and excavation operations and <br /> certify on the as-built plans that the inspection results and the as-built conditions of the <br /> development were constructed in general compliance with the project geotechnical report and <br /> improvement plans. The results of the inspections shall be submitted to the Chief Building and <br /> Safety Official prior to City Council acceptance of the public improvements, if applicable. The <br /> applicant shall bear all costs for work related to this condition by their geotechnical engineer. <br /> (Address this condition prior to issuance of an occupancy permit) <br /> 55. ENCROACHMENT AND HAUL ROUTE PERMITS: The applicant's contractor shall obtain an <br /> encroachment and haul route permit from the Engineering Department prior to moving equipment <br /> to the project site or performing work in the public right of way or within public easements. The <br /> applicant's contractor shall submit a completed and signed encroachment permit application <br /> accompanied with six copies of City-approved improvement plans, proof of insurance with <br /> endorsement adding the City as an additional insured, a copy of a valid City of Pleasanton <br /> business license, applicable fees, and other requirements determined by the Director of <br /> Engineering/City Engineer. (Address this condition prior to permit issuance) <br /> 56. DAMAGE TO EXISTING PUBLIC AND PRIVATE IMPROVEMENTS: The applicant shall repair <br /> damage to existing public and private improvements on and near the project site and along the <br /> haul route at their full expense caused by construction activities as determined and to the <br /> satisfaction of the Director of Engineering/City Engineer and prior to the City Council acceptance <br /> of public improvements. (Address this condition prior to issuance of an occupancy permit) <br /> 57. AS-BUILT DRAWINGS: The applicant's California licensed civil engineer shall submit signed and <br /> stamped as-built drawings and AutoCAD files for the construction of the public improvements and <br /> stormwater treatment system subject to the review and approval of the Director of <br /> Engineering/City Engineer and prior to the release of the performance and labor and materials <br /> bond. (Address this condition prior to issuance of an occupancy permit) <br /> Utilities <br /> 58. UTILITY VAULTS: The applicant shall set existing and proposed utility vaults to the grade of <br /> adjacent curb and/or sidewalk as determined by and subject to the review and approval of the <br /> Page 9of16 <br />